Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM03277
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/14/2009 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
12/14/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
12/14/2009 | RONALD BROWN | ADA | REVIEW | Passed | |
12/14/2009 | ROBERT SHERRY | WATER | REVIEW | Approved | |
12/14/2009 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
12/14/2009 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
12/14/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Install the air admittance valve per the manufacturer's instructions. 2. Provide fixture descriptions for all plumbing fixtures. All plumbing fixtures and fittings shall be listed or labeled by a nationally-recognized, accredited conformity assessment company (e.g. UL, ETL, NSF, UPC, etc). Reference: Sections 301.1.1 and 401.1, UPC 2006. 3. Provide legible drawings. 4. Specify the materials to be used for the piping; "...chosen by the contractor in the field" is unacceptable. 5. Appliances (e.g. coffee makers) to be directly connected to the water supply system that do not have listed, integral backflow preventers or integral air gaps may require reduced pressure principle backflow preventers. Specify the type of backflow prevention device required for each water connection. Reference: Section 603.0, UPC 2006, as amended by the City of Tucson. 6. Clarify the installation of the 3-compartment sink; are two of the compartments directly-connected and 1 indirectly connected? |
12/14/2009 | DAVE MANN | FIRE | REVIEW | Approved | |
12/14/2009 | RONALD BROWN | ZONING HC | REVIEW | Approved | |
12/14/2009 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
12/16/2009 | CAGUILA1 | WWM | REVIEW | Needs Review | |
12/16/2009 | CAGUILA1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review |