Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T09CM03277
Parcel: 13215001B

Address:
705 E AJO WY

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T09CM03277
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/14/2009 STEVE SHIELDS ZONING REVIEW Approved
12/14/2009 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed
12/14/2009 RONALD BROWN ADA REVIEW Passed
12/14/2009 ROBERT SHERRY WATER REVIEW Approved
12/14/2009 RONALD BROWN BUILDING-COMMERCIAL REVIEW Approved
12/14/2009 PAUL MACHADO ENGINEERING REVIEW Approved
12/14/2009 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Install the air admittance valve per the manufacturer's instructions.
2. Provide fixture descriptions for all plumbing fixtures. All plumbing fixtures and fittings shall be listed or labeled by a nationally-recognized, accredited conformity assessment
company (e.g. UL, ETL, NSF, UPC, etc). Reference: Sections 301.1.1 and 401.1, UPC 2006.
3. Provide legible drawings.
4. Specify the materials to be used for the piping; "...chosen by the contractor in the field" is unacceptable.
5. Appliances (e.g. coffee makers) to be directly connected to the water supply system that do not have listed, integral backflow preventers or integral air gaps may require reduced pressure principle backflow preventers. Specify the type of backflow prevention device required for each water connection. Reference: Section 603.0, UPC 2006, as amended by the City of Tucson.
6. Clarify the installation of the 3-compartment sink; are two of the compartments directly-connected and 1 indirectly connected?
12/14/2009 DAVE MANN FIRE REVIEW Approved
12/14/2009 RONALD BROWN ZONING HC REVIEW Approved
12/14/2009 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
12/16/2009 CAGUILA1 WWM REVIEW Needs Review
12/16/2009 CAGUILA1 ELECTRICAL-COMMERCIAL REVIEW Needs Review