Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM03271
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/11/2009 | MICHAEL ST. PAUL | ZONING | REVIEW | Passed | |
12/11/2009 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Approved | |
12/14/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Project: T09CM03271 Call out lighting circuits,provide panel designation,and load in panel schedule. 2. Finish total load calculations for panel A. Ray T Majuta Elect Pln CK 12/14/09 520/837/4988 |
12/14/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
12/14/2009 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Need structural calculations for replacement of HVAC units on roof. 2. Reclassify hanger as H-2 Aircraft Hanger Repair. 3. Verify fire rating of wall separating offices. It must be 3 hour as per table 508.3.3. Modify wall as required to meet fire rating requirements. 4. Confirmm window existing and new, fenistration rating in fire separation wall. |
12/14/2009 | ROBERT SHERRY | WATER | REVIEW | Approved | |
12/14/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The T&P relief pipe shall not be combined with the water heater pan drain. 2. Provide a light source for the water heater area above the ceiling. |
12/14/2009 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
12/14/2009 | RONALD BROWN | ADA | REVIEW | Passed | |
12/14/2009 | RONALD BROWN | ZONING HC | REVIEW | Denied | 1. Provide a compliant water cooler. 2. Lavs must be 2'-10" a.f.f. 3. Provide dim ensions for accessible accessories, grad bars, etc. END OF REVIEW |
12/31/2009 | GBONILL1 | WWM | REVIEW | Needs Review | |
12/31/2009 | GBONILL1 | FIRE | REVIEW | Needs Review |