Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM03210
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/09/2009 | DAVE MANN | FIRE | REVIEW | Approved | |
12/16/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A2-1; KEY NOTE 8: DID NOT LOCATE KEY NOTE REFERENCE ON THE PLAN. VERIFY. 2. SHEET S2-1; DETAIL 8/S4-3: ON THE DETAIL, WHERE IS THE HEADER BEAM (HDR22) THAT IS INDICATED ON THE PLAN? CLARIFY. 3. SHEETS S2-1, 2-2, 2-3, AND 2-4: PROVIDE STRUCTURAL CALCULATIONS FOR THE METAL HEADERS, HEADER SUPPORTS, AND BRACING MEMBERS. 4. GENERAL: LETTERING MUST BE A MINIMUM OF 3/32" IN HEIGHT ON ALL SHEETS (A1-1, A6-6). 5. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
12/17/2009 | ERIC NEWCOMB | ZONING HC | REVIEW | Approved | |
12/21/2009 | RICK MYERS | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Item not addressed. Provide a design for the mounting shelf for the hot water heater, along with the structural calculations to show that the water heater is safely supported. Reference 310.0 and 314.5 2006 UPC. 2. Item not addressed. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference 413.1 2006 UPC and 504.3 2006 IECC. 3. Item not addressed. Provide a vacuum relief valve for the storage type water heater located above the fixture outlets. Reference 608.7 2006 UPC. 4. Show the locations of the water hammer arrestors. |
12/28/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Comment not addressed. Section 403.3, IMC 2006, as amended by the City of Tucson allows the use of the ASHRAE 62-1-2004 (not the ASHRAE 62-2001) ventilation calculation procedure provided that the default occupant densities and combined outdoor air rates are used. 2. Comment not addressed. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. The minimum insulation for ducts located in indirectly conditioned spaces within the building envelope is R-4.2 (installed). Reference: Section 503.2.7, IECC 2006, as amended by the City of Tucson. 3. Comment not addressed. Condensate drains may not terminate over a roof drain or gutter unless the roof drain or gutter terminates at or above grade in an area capable or absorbing the condensate flow without surface drainage. Reference: Section 307.2.1, IMC 2006, as amended by the City of Tucson. |
12/31/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Project: 5870 E Broadway Bl, T09CM03210 Gap, TI The electrical plans have been denied for the following: 1. The over-current protection at the landlords Switch Gear is 800 amps, the parallel conductors (4 350's #1 grd) are rated at 610 amps, thus requiring a 700 amp fuse, per NEC-240 The ground for this circuit should be 1/0 awg for this size circuit per NEC- 250.122. 2. Provide documentation on landlord allowed ampacity for this space. 3.The feeder from the landlords Switch Gear feeds a J-box where the feed appears to go to both Panel G and this space, what would be the combined load on the feeder for both ? Why is this load included on the feeder to the Gap ? 4. Sheet E9-0, shows on the Equipment Wiring Schedule for Panels B and C to be 480/277v. 5. Sheet E9-0 shows the voltage for the water heater to be 277v.? Please correct and resubmit. Ray T Majuta Elect Pln CK, PDSD, City of Tucson, 1/03/01 Ray.Majuta@tucsonaz.gov |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/12/2010 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
01/12/2010 | SUE REEVES | REJECT SHELF | Completed |