Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM03210
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/08/2009 | TERRY STEVENS | ZONING | REVIEW | Approved | |
12/08/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Section 403.3, IMC 2006, as amended by the City of Tucson allows the use of the ASHRAE 62-1-2004 (not the ASHRAE 62-2001) ventilation calculation procedure provided that the default occupant densities and combined outdoor air rates are used. 2. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. The minimum insulation for ducts located in indirectly conditioned spaces within the building envelope is R-4.2 (installed). Reference: Section 503.2.7, IECC 2006, as amended by the City of Tucson. 3. Condensate drains may not terminate over a roof drain or gutter unless the roof drain or gutter terminates at or above grade in an area capable or absorbing the condensate flow without surface drainage. Reference: Section 307.2.1, IMC 2006, as amended by the City of Tucson. |
12/08/2009 | RICHARD JIROUDEK | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
12/08/2009 | ROBERT SHERRY | WATER | REVIEW | Approved | |
12/08/2009 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Needs Review | |
12/08/2009 | GERRY KOZIOL | WWM | REVIEW | Approved | |
12/08/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The applicable code for all commercial plumbing projects is the 2006 Uniform Plumbing Code with Local Amendments. Provide an approved appeal to the building official if the plans are to be reviewed to the 2006 IPC. 2. Provide a vacuum relief for storage-type water heaters located above any fixture outlets. Reference: Section 608.7, UPC 2006. 3. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006. 4. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006. |
12/08/2009 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Approved | |
12/08/2009 | DAVE MANN | FIRE | REVIEW | Approved | |
12/08/2009 | RONALD BROWN | ADA | REVIEW | Passed | Not a COT owned/operated property |
12/08/2009 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
12/08/2009 | RONALD BROWN | ZONING HC | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/08/2009 | DELMA ROBEY | OUT TO CUSTOMER | Completed |