Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T09CM03199
Parcel: 136244500

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T09CM03199
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/25/2010 GERRY KOZIOL WWM REVIEW Approved
12/07/2009 MICHAEL ST. PAUL ZONING REVIEW Approved
12/07/2009 ROBERT SHERRY WATER REVIEW Approved
12/07/2009 RICHARD JIROUDEK ELECTRICAL-COMMERCIAL REVIEW Denied Plans denied for the following:

1. Min. font size to be 3/32" per city submittal requirements.

2. Provide complete single line diagram of service per city submittal requirements.

3. Provide complete fault current analysis per city submittal requirements.

4. Provide 2006 IECC light budget calculations and luminare switching per city submittal requirements.

5. Plan shows 205 amp load on phase A and have 3/0 conductors installed with a rating of 200 amps. Need to balance load on panel.

Rich Jiroudek
Electric Plans Examining
520-954-0161
12/07/2009 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Show the size, routing, and termination of the condensate drains. Reference: Section 307.2, IMC 2006 and Section 814.0, UPC 2006.
2. Provide calculations demonstrating adequate ventilation. Reference: Section 401.2, IMC 2006.
3. Materials exposed in plenums shall conform to Section 602.2.1, IMC 2006.
4. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference: Section 503.2.7, IECC 2006, as amended by the City of Tucson.
12/07/2009 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. COVER SHEET; CODE REVIEW CRITERIA: PROVIDE INFORMATION ON THIS SHEET FOR CONSTRUCTION TYPE AND OCCUPANCY LOAD (REQUIRED FOR CERTIFICATE OF OCCUPANCY).
2. SHEET A2.0; KEY NOTES: NOTE 9 INDICATES STRUCTURAL SUPPORT FOR THE OVERHEAD DOOR. THE NEW 8' OPENING REQUIRES A NEW LINTEL OVER THE DOOR (EXISTING OPENING ONLY 4'). PROVIDE LINTEL CALCULATION AND DETAILS.
3. SHEET M0.1; RTU SCHEDULE: PROVIDE STRUCTURAL CALCULATIONS INDICATING THAT THE EXISTING ROOF IS CAPABLE OF SUPPORTING THE 4-800# RTU'S.
4. SHEET M6.1; DETAIL 4: PROVIDE THE SUPPORT ANGLE DETAIL FOR THE WATER HEATER. INCLUDE THE ANGLE SIZE AND SPACING, AND CONNECTION OF THE ANGLE TO THE WALL.
5. SHEET M6.1; DETAIL 8: DETAIL INDICATES SUPPORT OF THE UNIT HEATER ON STRUCTURAL PLANS (NO PLANS AVAILABLE). PROVIDE THE DETAIL ON THESE DRAWINGS.
12/07/2009 PAUL MACHADO ENGINEERING REVIEW Approved
12/07/2009 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide complete plumbing plan, including a water supply isometric, gas piping, and waste and vent isometrics. Reference: Section 103.2.3, UPC 2006.
2. Clarify the size of the water supply to the water closets; is it ½" as noted in the plumbing general notes or 1-1/2" as noted in the plumbing fixture connection schedule. Reference: Section 103.2.3, UPC 2006.
3. Provide a vacuum relief for storage-type water heaters located above any fixture outlets. Reference: Section 608.7, UPC 2006.
4. The temperature and pressure relief piping shall not terminate into a water heater pan. Reference: section 508.5, UPC 2006.
5. Clarify the reason for a trap for the water heater pan. Reference: Section 103.2.3, UPC 2006.
6. Show the return piping for recirculated hot water on the plans. Reference: Section 103.2.3, UPC 2006.
12/07/2009 DAVE MANN FIRE REVIEW Denied Fire Comments:

Show location of fire walls.
Clarify, first page says no fire sprinklers. Second page says fire sprinklers engineered by others.
Fire comments:

Exits must be 1/2 the diagonal distance apart and not through storage.
12/07/2009 ERIC NEWCOMB ADA REVIEW Passed
12/07/2009 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
12/07/2009 ERIC NEWCOMB ZONING HC REVIEW Approved