Permit Number: T09CM03175
Parcel: 11460019C

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T09CM03175
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/03/2009 STEVE SHIELDS ZONING REVIEW Approved
12/03/2009 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Complete recirculation of ventilation air from toilet rooms is prohibited (I.e. air is supplied to the room when the exhaust fan is turned off). Reference: Section 403.2.1 (3), IMC 2006.
2. Clarify how the condensate drain connects to the storm drain and determine if the termination of the storm drain results in any surface water flow. Reference: Section 307.2.1, IMC 2006, as amended by the City of Tucson.
3. The minimum insulation for ducts located in indirectly conditioned spaces within the building envelope is R-4.2 (installed). Reference: Section 503.2.7, IECC 2006, as amended by the City of Tucson.
12/03/2009 RICHARD JIROUDEK ELECTRICAL-COMMERCIAL REVIEW Denied Plans denied for the following:

1. Provide IECC calculations and switching per City of Tucson submittal requirements. Requirements for submittals located on city web site.

Rich Jiroudek
Electric plns examining
520-954-0161
12/03/2009 ROBERT SHERRY WATER REVIEW Approved
12/03/2009 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET A-401; DETAIL B: PROVIDE VERTICAL GRAB BAR PER ICC/ANSI A117.1-2003 FIGURE 604.5.1 AND INDICATE ON DRAWING.
2. SHEET I-001; ROOM FINISH SCHEDULE: A MINIMUM OF 3/32" HEIGHT LETTERING IS REQUIRED.
3. SHEET I-401; DETAIL B4: PROVIDE ACCESSIBLE SERVICE COUNTER PER IBC SECTION1109.12.3.
12/03/2009 GERRY KOZIOL WWM REVIEW Approved
12/03/2009 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006.
2. Clarify how the temperature of the hot water supply to the public lavatories is controlled to 110 degrees Fahrenheit. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006.
3. Clarify how the trap primer shown in detail 2/P-101 works without draining the sink trap. Provide listing information. Reference: Section 103.2.3, UPC 2006. (Note that the minimum font size is 3/32")
4. Provide a vacuum relief for storage-type water heaters located above any fixture outlets. Reference: Section 608.7, UPC 2006.
5. Provide an expansion tank or other approved device for controlling thermal expansion for storage-type water heaters. Reference: Section 608.3, UPC 2006.
12/03/2009 PAUL MACHADO ENGINEERING REVIEW Approved
12/03/2009 DAVE MANN FIRE REVIEW Approved
12/03/2009 ERIC NEWCOMB ADA REVIEW Passed
12/03/2009 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
12/03/2009 ERIC NEWCOMB ZONING HC REVIEW Denied 1. SEE BUILDING COMMENTS.