Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL BLDG/WWM
Permit Number - T09CM03124
Review Name: RESIDENTIAL BLDG/WWM
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/19/2010 | ERIC NEWCOMB | BUILDING-RESIDENTIAL | REVIEW | Denied | PLAN REVIEW COMMENTS T09CM03124 Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, we request that you please provide revised plans and calculations, highlighting any changes, along with a written response to each of the noted items indicating action taken. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2006 International Residential Code, 2006 International Energy Conservation Code, and Arizona State amendments to the 2006 Uniform Plumbing Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. GENERAL REQUIREMENTS: All corrections and revisions shall be made on original tracings or a finished reproducible set. Return two sets along with a set of the first submission for reference. Pen or pencil corrections on final prints will not be acceptable. To avoid delays, ensure that all corrections have been made, are complete, and have been coordinated on all applicable detail and note sheets. (Do not cloud the changes made for comment revisions). Incorporate changes on originals and provide two copied sets for review. All engineers and architects involved in the design of the structure are to seal the related sheets of plans, details and calculations in accordance with the rules of the State Board of Technical Registration. The City of Tucson adopted the 2006 IRC with amendments on 6/12/2007; the 2006 UPC with amendments on 7/10/2007; effective 1/1/2007 the Inclusive Home Design; starting 3/1/2009 Solar Water Preparation and 7/1/2009 Solar Photo-Voltaic Preparation. All new SFR and duplex plans should reference these codes. Amendments to adopted codes are at the City website http://www.tucsonaz.gov: Planning, Building & Business; under the Building topic; Building Ordinances and Codes; Building Codes. GENERAL: 1. All lettering must be a minimum of 3/32" in height. SITE PLAN: 1. Locate the south edge of the new carport from the property line. FLOOR PLANS: 1. Identify ceiling heights in all areas. Note the average height at sloped ceilings (R305.1). 2. Specify the thermal barrier protection from the rigid foam on gable ends (R314.5.3). 3. Show the hearth size and materials, R1001 or R1004. Provide fireplace cut sheets or not the requirement for deferred submittal approval prior to installation. 4. Provide 1/2" gypsum board on all walls common to the garage and house (R309.2). 5. The section cut A/A4 on sheet A1 is not on A4. 6. Indicate the wall types (from the wall legend) on sheet A1. 7. Add section keynotes to the building sections on sheet A4. FOUNDATION PLANS: 1. Note the grade from foundations shall fall a minimum of 6" within the first 10' (R401.3). Add this to the general foundation note 1 on sheet S1. 2. A landing or floor surface is required at all exterior doors (R311.4.3). Add at the area from the foyer and the carport. 3. Include foundation keynotes to the plan on sheet S1. 4. No hold downs are indicated on the plan on S1. Verify that this is correct. STRUCTURAL/FRAMING PLANS: 1. Show the size, spacing, and span of various ledgers, beams, lintels, headers, and columns on the plans. 2. Provide a header schedule consistent with Table 502.5(1). 3. Provide sufficient nailing for each framing member (Table R602.3(1)). Change note 34 of the general structural notes. 4. Provide a complete braced wall panel layout showing panels at the ends (within 12.5') of all wall lines and additional panels centered at least every 25' between (Table R602.10.1) All exterior wall lines shall be braced and parallel interior wall lines shall be braced at intervals not exceeding 35' from exterior wall lines (R403.1.6, R602.10.1.1, R602.10.8). 5. Include framing keynotes to the plan on sheet S2. 6. Show the connection of the exterior stud wall to the masonry wall at the northeast corner of the bath. SECTIONS/DETAILS: 1. Provide 6" separation of untreated posts or columns above finished grade and 1" above concrete (R319.1.4). 2. Provide 6" minimum foundation height above finished grade (4" with veneer) (R404.1.6). 3. Specify the water resistive barrier over the wall framing (R703.6.3). 4. Show weep screeds in the stucco with a minimum clearance 4" above grade or 2" above paved areas (R703.6.2.1). 5. Provide draft stopping at concealed spaces (walls, partitions, furred spaces, ceiling and floor levels, around vents, chimneys/fireplaces, stairs) (R602.8). 6. Note and specify the size, spacing and length of anchor bolts for ledgers (R606.11). 7. Specify lateral support for the masonry walls (R606.9). 8. Provide dimensions, sections, and firebox plan of masonry fireplaces. State the size of the flue and hearth. 9. Add masonry notes to the General Structural Notes. ELECTRICAL PLANS: 1. Provide feeder load calculations for sub-panels (40% demand factor may not be applied) (E3604.3). 2. Show locations of smoke detectors (every sleeping room and hallways leading to those rooms). All smoke detectors must be interconnected with a power source from the building wiring, and shall be equipped with battery backup. When ceiling finish materials are not removed, existing bedrooms may be equipped with battery operated smoke detectors (R313). 3. Smoke detectors are required in existing buildings when interior alterations occur (R313.2.1). 4. Lights installed over a shower or bathtub must be approved for use in wet area (E3903.8). PLUMBING PLANS: 1. Provide pressure and temperature relief valve terminating to the exterior facing down between 6" and 24" above grade (UPC 608.5). 2. Water conservation requirements: Water closets = 1.6 gallons per flush; Sinks/Showerheads = 3 gpm (UPC State Amendment 45-312. 3. Provide a gas line isometric and size the supply pipe for the connected demand. Include the length of line and BTU demand for each appliance, size of each branch, total demand, and total developed length from meter to the most remote appliance on the system (UPC 1217.0, Table 12-8). MECHANICAL PLANS: 1. Provide location of return air ducts and register sizes (M1602). Minimum duct/register size: heat pump or air conditioner: 6 sq. in/1000 BTU (M1403.1). 2. Show supply and return ducts with minimum R-8 insulation (R1103.2.1). 3. Provide signed and dated seal by the engineer of record on sheet M1. 4. Sheet M1 is incomplete. Finish supply duct/diffuser sizes. 5. Provide returns as required on sheet M1. INTERNATIONAL ENERGY CONSERVATION CODE: 1. Specify the R value of the insulation, as well as the U factor and the solar heat gain coefficient of the windows and doors (N1102.1). 2. Provide a note requiring the insulation certificate shall be posted in the electrical distribution panel before final inspection (N1101.8). |
| 12/17/2009 | GERRY KOZIOL | WWM | REVIEW | Denied | needs 5th floor wastewater credit evaluation |