Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM03081
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/24/2009 | TERRY STEVENS | ZONING | REVIEW | Approved | |
| 11/24/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Minium font size is 3/32". 2. Show the piping material and insulation for the new chilled water extensions. 3. Provide information regarding the installation of the walk-in cooler evaporators and condensing units (e.g. specifications, weights, condensate drains) 4. Provide power for the chilled water pumps. |
| 11/24/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
| 11/24/2009 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 11/24/2009 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 11/24/2009 | CPIERCE1 | WWM | REVIEW | Approved | approved by county. stamp on plans (this entry by LeeRay) |
| 11/24/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The minimum font size is 3/32". 2. Provide riser diagrams for the new plumbing installations (water and waste & vent). 3. Verify the size of the watrer supplies to the relocated eyewashes. 4. If the ice machine is not equipped with either an air gap or an integral backflow preventer, provide backflow prevention for the ice machine (indicate the type on the drawing). |
| 11/24/2009 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
| 11/24/2009 | DAVE MANN | FIRE | REVIEW | Approved | |
| 11/24/2009 | RONALD BROWN | ADA | REVIEW | Passed | Not a COT owned/operated property |
| 11/24/2009 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 11/24/2009 | RONALD BROWN | ZONING HC | REVIEW | Approved |