Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM02800
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/19/2009 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
| 10/19/2009 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Approved | |
| 10/23/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | The review of the kitchen plumbing cannot be done until the Pima County Health Department has reviewed the drawings. |
| 10/23/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the design of the grease duct shaft to comply with the requirements of Section 506.3.10, IMC 2006. The supports for the shaft shall also comply with section 506.3.6, IMC 2006. 2. Provide structural calculations and details to show how the Type I hood is supported from the building structure. Reference: section 507.6, IMC 2006. 3. Provide information regarding the construction of the walls adjoining the Type I hood. Reference: Section 507.9, IMC 2006. 4. Clarify the design of the Type I hood, i.e. "fully compensating" with regard to the proportion of any air being supplied to the hood cavity. Reference: sections 507.13 and 508.2, IMC 2006. 5. Provide information to show that the operation of the hood exhaust system complies with the requirements of Section 507.2.1.1, IMC 2006. 6. Show how the introduction of make up air into the space complies with Section 508.1.1, IMC 2006. 7. The minimum size of the lettering shall be 3/32" in height. |
| 10/23/2009 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | Please provide structural details and calculations for new exhaust hood support from existing structure. |
| 10/23/2009 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 10/23/2009 | DAVE MANN | FIRE | REVIEW | Approved | |
| 12/10/2009 | GBONILL1 | WWM | REVIEW | Needs Review | |
| 12/10/2009 | GBONILL1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
| 12/10/2009 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
| 12/10/2009 | GBONILL1 | ZONING HC | REVIEW | Needs Review | |
| 12/10/2009 | GBONILL1 | ADA | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/10/2009 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |