Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T09CM02800
Parcel: 121060070

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T09CM02800
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/19/2009 MICHAEL ST. PAUL ZONING REVIEW Approved
10/19/2009 BIANCA RAMIREZ ENGINEERING REVIEW Approved
10/23/2009 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied The review of the kitchen plumbing cannot be done until the Pima County Health Department has reviewed the drawings.
10/23/2009 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Revise the design of the grease duct shaft to comply with the requirements of Section 506.3.10, IMC 2006. The supports for the shaft shall also comply with section 506.3.6, IMC 2006.
2. Provide structural calculations and details to show how the Type I hood is supported from the building structure. Reference: section 507.6, IMC 2006.
3. Provide information regarding the construction of the walls adjoining the Type I hood. Reference: Section 507.9, IMC 2006.
4. Clarify the design of the Type I hood, i.e. "fully compensating" with regard to the proportion of any air being supplied to the hood cavity. Reference: sections 507.13 and 508.2, IMC 2006.
5. Provide information to show that the operation of the hood exhaust system complies with the requirements of Section 507.2.1.1, IMC 2006.
6. Show how the introduction of make up air into the space complies with Section 508.1.1, IMC 2006.
7. The minimum size of the lettering shall be 3/32" in height.
10/23/2009 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied Please provide structural details and calculations for new exhaust hood support from existing structure.
10/23/2009 ROBERT SHERRY WATER REVIEW Approved
10/23/2009 DAVE MANN FIRE REVIEW Approved
12/10/2009 GBONILL1 WWM REVIEW Needs Review
12/10/2009 GBONILL1 ELECTRICAL-COMMERCIAL REVIEW Needs Review
12/10/2009 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review
12/10/2009 GBONILL1 ZONING HC REVIEW Needs Review
12/10/2009 GBONILL1 ADA REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
12/10/2009 GERARDO BONILLA OUT TO CUSTOMER Completed