Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T09CM02784
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/06/2009 | ERIC NEWCOMB | ZONING HC | REVIEW | Approved | |
| 11/06/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Show how the specified unit heater is capable of maintaining a minimum temperature of 68 F in the interior spaces intended for occupancy on a design heating day (32 F). Reference: Sections 309.1 and 312.1, IMC 2006 |
| 11/06/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 11/06/2009 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 11/06/2009 | RICHARD JIROUDEK | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 11/06/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide plans sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. 2. Show how the temperature of the hot water supply to the public lavatory is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006. 3. Revise the termination point of the water heater flue to comply with Section 510.6.2, UPC 2006 (i.e. at least 2 feet above any point on the roof within 10 feet of the flue). 4. Provide pressure-absorbing devices for the water connections to appliances equipped with quick-acting or solenoid valves (i.e. water hammer arrestors for the washers). Reference: Section 609.10, UPC 2006 5. Provide a vent downstream of the trap for the trench drain. Reference: Sections 901.0 and 910.1, UPC 2006. 6. Size natural gas pipe per Section 1217.1, UPC 2006 or provide calculations demonstrating conformance to Section 1217.3, UPC 2006. 7. Coordinate the size of the waste piping for the trench drain. Reference: Section 103.2.3, UPC 2006 8. Provide drains for the evaporative coolers. |
| 12/02/2009 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
| 12/02/2009 | CPIERCE1 | WWM | REVIEW | Needs Review |