Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T09CM02694
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/07/2009 | DAVE MANN | FIRE | REVIEW | Denied | Please include the following fire sprinkler design criteria to the plans. 1. Flow data (static pressure, residual pressure, GPM) Available from the Fire Department (520) 791-3234 2. The standard to be used in development of sprinkler system. (NFPA 13, NFPA 13R, or NFPA 13D) 3. The hazard classification of the building, including any special hazards. 4. The density required of the water supply. |
10/09/2009 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Provide foundation plan references to all footing/pier details used shown on sheet AB2 of 2. 2. Calculations provided for the two footing/piers of the left side of sheet AB2 of 2 but they are incomplete for the footing/pier shown on the right side of the sheet. If this detail is not used, please delete it. If it is used please reference to foundation plan and provide complete calculations. |
10/09/2009 | RONALD BROWN | ZONING HC | REVIEW | Passed | |
10/15/2009 | GERRY KOZIOL | WWM | REVIEW | Passed | |
10/16/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
10/23/2009 | TERRY STEVENS | ZONING | REVIEW | Denied | 10/23/2009 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming. |
10/26/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
10/26/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
10/26/2009 | ROBERT SHERRY | WATER | REVIEW | Passed | |
10/28/2009 | LAITH ALSHAMI | ENGINEERING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/06/2009 | CPIERCE1 | OUT TO CUSTOMER | Completed |
11/06/2009 | SUE REEVES | REJECT SHELF | Completed |