Permit Number: T09CM02664
Parcel: 141012130

Review Status: Completed

Review Details: COMMERCIAL NEW

Permit Number - T09CM02664
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/05/2009 DAVE MANN FIRE REVIEW Denied Panic hardware is required in A occupancies with an occupant load greater than 50. IFC 1008.1.9.

A combination A/R occupancy requires fire sprinklers. IFC 903.2.7.

Please include the following fire sprinkler design criteria to the plans.
1. Flow data (static pressure, residual pressure, GPM)
Available from the Fire Department (520) 791-3234
2. The standard to be used in development of sprinkler system. (NFPA 13, NFPA 13R, or NFPA 13D)
3. The hazard classification of the building, including any special hazards.
4. The density required of the water supply.
10/07/2009 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET C-1; CODE REVIEW (PLUMBING REQUIREMENTS): TABLE 2902.1 AND SECTION 1109.5 OF THE IBC REQUIRE A HIGH-LOW OR SINGLE POINT OF USE DRINKING FOUNTAIN. VERIFY.
2. SHEET A-1; ROOM SCHEDULE: FOR WASHROOMS #104 AND #105, THE WALL MATERIAL DOES NOT MEET IBC SECTION 1210.2 REQUIREMENTS, OR DRAWING A-2 (TYPICAL BATHROOM ELEVATIONS). COORDINATE.
3. SHEET A-1; LOWER LEVEL FLOOR PLAN: PROVIDE AN ENLARGED, DIMENSIONED PLAN OF THE WASHROOMS, INDICATING CRITICAL ACCESSIBILITY REQUIREMENTS PER ICC/ANSI A117.1-2003, CHAPTER 6.
4. SHEET A-2; CONSTRUCTION NOTES: REMOVE THE ADA REFERENCE AND REPLACE IT WITH ICC/ANSI A117.1-2003.
5. SHEET A-4; SECTIONS: CHANGE THE FOOTING CONFIGURATIONS TO MATCH THOSE INDICATED ON SD1.
6. SHEET A-4; STAIR SECTION A: PROVIDE DETAILS AND/OR SPECIFICATIONS FOR THE STAIR HANDRAILS TO MEET IBC REQUIREMENTS OF SECTION 1012.
7. SHEET A-4; DETAIL 6: PROVIDE DETAILS AND/OR SPECIFICATIONS FOR THE BALCONY CONSTRUCTION TO MEET IBC FIRE RESISTANCE REQUIREMENTS OF SECTION 1406.3.
8. SHEET GSN; SOIL NOTES: IS THERE A CURRENT SOILS REPORT FOR THIS PROJECT? IF SO, PROVIDE FOR REVIEW.
9. SHEET GSN; NAILING SCHEDULE: CHANGE THE SCHEDULE REFERENCE FROM TABLE R602.3(1) WHICH IS THE IRC TO TABLE 2304.9.1 OF THE IBC.
10. SHEET S-2; L.L. FRAMING PLAN; STRUCTURAL CALCULATIONS SHEET 2: BEAMS 17 (2 THUS) INDICATED IN THE CALCULATIONS DO NOT SHOW UP ON THE FRAMING PLAN. PROVIDE.
11. SHEET SD1; SECTIONS 2, 7, AND 8: THESE SECTIONS MAKE REFERENCE TO A FOOTING SCHEDULE FOR THE FOOTING WIDTH. NO SCHEDULE CAN BE FOUND. VERIFY.
12. SHEET SD1; ALL SECTIONS: PROVIDE SOILS REPORT THESE SECTIONS REFER TO.
13. GENERAL: A MINIMUM OF 3/32" TALL LETTERING IS REQUIRED ON ALL SHEETS (SEE SHEETS A-4, SD1, AND SD2).
14. GENERAL: ALL DEFERRED SUBMITTALS MUST BE APPROVED BY LEERAY HANLY, AND REVIEWED BEFORE A PERMIT WILL BE ISSUED.
15. GENERAL: DID NOT FIND THE STRUCTURAL CALCULATIONS FOR ALL OF THE BUILDING FOOTINGS. PROVIDE.
16. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
10/08/2009 ERIC NEWCOMB ZONING HC REVIEW Denied 1. SEE BUILDING COMMENTS.
10/14/2009 GERRY KOZIOL WWM REVIEW Approved
10/19/2009 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope and be consistent with the energy calculations. The information shall, as a minimum, include the correct areas for components, U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006.
2. The building section on sheet A-4 and detail 4/A-4 show the installation of skylights and solar tubes. If they are part of this activity, show their sizes and locations and include them in the energy calculations.
3. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Section 503.2, IECC 2006.
4. Show how the fan coils are being connected to the building structure and provide calculations to show that the building structure is not being adversely affected. Reference: Section 302.1, IMC 2006.
5. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top units, mechanical screen, and solar collectors. Reference: Section 302.1, IMC 2006.
6. Show the location of the temperature controls for each heat pump. Each control shall be designed for use with a heat pump having an auxiliary electric heat (the Honeywell T7000 thermostat is for use with radiators). Reference: Section 503.2.4, IECC 2006.
7. Provide calculations demonstrating adequate ventilation for the dance studio. Reference: Section 401.2, IMC 2006.
8. Coordinate the mechanical design of the kitchen with the architectural design. Reference: Section 106.1.3, IMC 2006.
10/19/2009 ROBERT SHERRY WATER REVIEW Approved
10/20/2009 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Show that there is adequate access to the cleanout shown for the bath tub. Reference: Sections 707.9 and 707.10, UPC 2006.
2. Provide the minimum plumbing facilities (e.g. drinking fountain) required by Table 2902.1 and Section 2902.2, IBC 2006, for business occupancy.
3. Replot sheet P-2.0 so that detail 203 is legible. Reference: Section 103.2.3, UPC 2006.
4. Provide listing information for the solar water heating equipment. Reference: Section 301.1, UPC 2006.
5. Revise the size of the provided scuppers to comply with the requirements of Section 1101.11.2.1, UPC 2006. Refer also to Section 1106.4, UPC 2006.
6. The overflow in the roof drain collector box shall have a drainage capacity equal to that of the scupper and a minimum opening height of 4". Reference: Section 1101.11.2.2.1, UPC 2006.
10/22/2009 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
10/26/2009 PAUL MACHADO ENGINEERING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
10/28/2009 CPIERCE1 OUT TO CUSTOMER Completed
10/27/2009 SUE REEVES REJECT SHELF Completed