Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T09CM02632
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/12/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. PREVIOUS COMMENT 8: PROVIDE A REFERENCE ON DETAIL C/A10.2 TO THE SPECIFIC STRUCTURAL SECTION ON SHEET S01.1. 2. PREVIOUS COMMENT 10: DID NOT LOCATE THE ANGLE BRACE SIZE OR CONNECTION DETAIL ON SHEET S01.1. AS REFERENCED ON DETAIL S/A10.3. PROVIDE. 3. PREVIOUS COMMENT 11: PROVIDE A REFERENCE ON DETAIL A/A11.1 TO THE SPECIFIC STRUCTURAL SECTION ON SHEET S01.1. 4. PREVIOUS COMMENT 12: PROVIDE A REFERENCE ON DETAIL A/A11.1a TO THE SPECIFIC STRUCTURAL SECTION ON SHEET S01.1. 5. PREVIOUS COMMENT 13: PROVIDE A REFERENCE ON DETAILS A/A11.2 AND E/A11.2 TO THE SPECIFIC STRUCTURAL SECTION ON SHEET S01.1. 6. PREVIOUS COMMENT 14: PROVIDE A REFERENCE ON DETAIL A/A11.5 TO THE SPECIFIC STRUCTURAL SECTION ON SHEET S01.1. 7. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
11/13/2009 | MARTIN BROWN | FIRE | REVIEW | Approved | |
11/16/2009 | GERRY KOZIOL | WWM | REVIEW | Approved | |
11/17/2009 | ERIC NEWCOMB | ZONING HC | REVIEW | Approved | |
11/24/2009 | CAGUILA1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
11/24/2009 | CPIERCE1 | WATER | REVIEW | Approved | |
11/24/2009 | CPIERCE1 | MECHANICAL-COMMERCIAL | REVIEW | Approved | Comment not resolved. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006. |
11/24/2009 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
11/24/2009 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Approved | |
11/24/2009 | CPIERCE1 | PLUMBING-COMMERCIAL | REVIEW | Denied | Comment not resolved. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006. |