Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM02423
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/11/2009 | RONALD BROWN | ADA | REVIEW | Passed | Not a COT owned/operated property |
09/14/2009 | DAVE MANN | FIRE | REVIEW | Approved | |
09/17/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
09/17/2009 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
09/18/2009 | ERIC NEWCOMB | ZONING HC | REVIEW | Passed | |
09/22/2009 | RMYERS1 | WWM | REVIEW | Passed | 1. no new plumbing fixtures being added. |
09/22/2009 | RICK MYERS | PLUMBING-COMMERCIAL | REVIEW | Passed | |
09/22/2009 | RMYERS1 | WATER | REVIEW | Passed | |
09/25/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Clarify keynote 8 on sheet M1.1; it is shown in details 2/M1.1 and 3/M1.1 but called out as "NOT USED" in the specific notes on M1.1. Reference: Section 106.3.1, IMC 2006. 2. Clarify how and where the evaporator condensate drains will be trapped and how the condensate lines will be protected from freezing. Reference: Section 304.1, IMC 2006. 3. Provide the operating capacity of each of the refrigerant systems, including the type and amount of the refrigerant used in each independent refrigerant circuit. Reference: Sections 106.3.1 and 1101.1, IMC 2006. 4. Provide information to show that a machinery room complying with the requirements of Section 1105, IMC 2006, is not required for the refrigeration equipment located inside the building. Reference: Section 1104.2, IMC 2006. |
09/30/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Project: 255 N Commerce Park T09CM02423 new cold storage vault The electrical plans have been denied for the following: 1. Provide a total load calculation in order to review change on whole load. Include individual new load. 2. Provide fault current let thur from line side of manual transfer switch on through to Panel WPLD. 3.NEC 2005, 250-30 A-3 ,grounding for a seperately derived system (trans) to be obtained from tablr 250-66, which for a 2/0 cu conductor would be a # 4 not # 6. 4. Disconnects required on evaporators (fans) from ACC unit. Ray T Majuta Elect Plan Ck, PDS City of Tucson 10/01/09 Ray.Majuta@tucsonaz.gov |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/07/2009 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
10/07/2009 | SUE REEVES | REJECT SHELF | Completed |