Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T09CM02387
Parcel: Unknown

Review Status: Completed

Review Details: POST 3RD PARTY REVIEW

Permit Number - T09CM02387
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/19/2009 DAVE MANN FIRE REVIEW Approved
11/19/2009 ROBERT SHERRY WATER REVIEW Denied Tucson Water limits a 1-1/2" meter to a maximum demand of 50 GPM. Provide a letter from Tucson Water confirming that the use of a 1-1/2" water meter will be allowed for this project (demand is 53 GPM). Reference: Sections 610.2 and 610.12, UPC 2006.
11/23/2009 GERRY KOZIOL WWM REVIEW Denied see T09CM02373 for comments.
11/24/2009 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: T09CM02387
Building Plan (1st Review)

TRANSMITTAL DATE: November 24, 2009

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the building plan was in compliance with the approved Development plan. Please submit two copies of the approved and stamped development plan with the next building plan submittal.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped development plan. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

C:\planning\grading\t09cm02373.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED:
11/25/2009 LAITH ALSHAMI ENGINEERING REVIEW Denied Laith Alshami, Engineering and Floodplain Review, 11/25/2009,

Develpment Plan has not been approved yet. Site Plan shall be approved after the Development Plan approval.
12/02/2009 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
12/02/2009 GERARDO BONILLA OUT TO CUSTOMER Completed