Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T09CM02359
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/08/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
01/08/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The Watts N36-M1 vacuum relief is to be installed in the CW supply line "with or above the highest point of the tank" according to its listing material. Note that note 1 in detail 2/P3.2 still calls for the installation of a pressure vacuum breaker; where will it be installed? Reference: Sections 302.2, 608.13.5, and 608.15.4, IPC 2006. 2. The listing information for the proposed water meter for use with the solar water heater did not indicate if it was NSF-61 certified; is it? Reference: Section 303.2, IPC 2006. 3. Details 5/P3.1 and 6/P3.1 show the CW and the solar HW entering WH-1 with only shut off valves for control. The specified water heater controls the delivered water temperature only by increasing its temperature, not reducing it. Show how the hot water delivery temperature from the tankless water heaters is to be limited to a maximum of 140 degrees Fahrenheit. Reference: Section 501.6, IPC 2006. |
01/26/2010 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
12/23/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. PREVIOUS COMMENT 7: PROVIDE STRUCTURAL CALCULATIONS FOR THE SUNSHADE FRAMING AND CONNECTION TO THE WALL. 2. PREVIOUS COMMENT 11: REMOVE THE TURNING CIRCLE FROM THE ACCESSIBLE BATHROOM PLAN ON SHEET A7.0. 3. PREVIOUS COMMENT 12: THE BACK WALL GRAB BAR MUST MEET ANSI FIGURE 604.5.2 ON THE INTERIOR ELEVATION 4(A) ON SHEET A7.0. 4. PREVIOUS COMMENT 13: ADD THE VERTICAL GRAB BAR ON THE INTERIOR ELEVATION 4(B) ON SHEET A7.0. 5. PREVIOUS COMMENT 14: THE BATHROOM WALLS ON SHEET A7.0 AND THE ROOM FINISH SCHEDULE ON SHEET A2.2 MUST MEET IBC SECTION 1210.2 REQUIREMENTS. 6. PREVIOUS COMMENT 16: THE SLAB REINFORCEMENT AS REFERENCED BY THE STRUCTURAL SHEETS S2.1, S2.2, AND S2.3 WAS NOT LOCATED ON THE ARCHITECTURAL DRAWINGS. 7. PREVIOUS COMMENT 19: CONCERNING THE CANOPY FRAMING INDICATED ON SHEETS A6.1 AND A6.2, PROVIDE THE 4" I-BEAM SIZE AND SPACING. PROVIDE STRUCTURAL CALCULATIONS FOR ALL FRAMING AND FOUNDATIONS AT THE CANOPIES. CHANGE THE CONNECTION OF THE 3X3 ANGLE (NOT AN ANCHOR BOLT). 8. SHEETS S2.1 AND S2.2: PER THE ARCHITECTURAL COMMENTS, THE PHOTOVOLTAIC SUPPORT STRUCTURES HAVE BEEN REMOVED FROM THIS PROJECT. DELETE PLAN NOTE 3 AND PLAN REFERENCES. 9. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
12/23/2009 | BEV HESTER | ENGINEERING | REVIEW | Passed | |
12/24/2009 | ERIC NEWCOMB | ZONING HC | REVIEW | Denied | 1. SEE BUILDING COMMENTS. |
12/24/2009 | JASON GREEN | ENGINEERING | REVIEW | Approved | DATE: December 29, 2009 SUBJECT: 7160 S Missiondale Road- 3rd Engineering Review TO: Poster Frost Associates LOCATION: T15S R15E Sec13 Ward 1 REVIEWERS: Jason Green, CFM ACTIVITY: T09CM02359 (Site Plan), T09BU01343 (Grading Plan) & T09OT02791 (Floodplain Use Permit) SUMMARY: Engineering Division of the Planning and Development Services Department has received and reviewed the revised site plan (T09CM02359), grading plan (T09BU01343), Floodplain Use Permit (T09OT02791), Hydrology/Hydraulic Report (Physical Resources Engineering Inc., 31AUG09, revised 14OCT09 and 15DEC09), Geotechnical Engineering Evaluation (Pattison Evanoff Engineering, LLC, 09JUL09) and Stormwater Pollution Prevention Plan (Physical Resources Engineering Inc., 21SEP09, revised 14OCT09) for the above referenced property. Engineering Division recommends approval of the site plan and grading plan at this time. 1) Review and approval from TDOT Permits and Codes for all improvements within the public right-of-way (public street and public channel) will be required. A right-of-way use permit application will be required prior to construction. Refer to the following links for TDOT Forms and applications: a. http://www.tucsonaz.gov/dsd/Forms_Fees___Maps/Applications/applications.html / b. http://www.dot.ci.tucson.az.us/engineering/pia.php c. Or contact Thad Harvison at 837-6592 for all additional questions regarding r-o-w. 2) Call for a Pre-construction meeting prior to start of earthwork. To schedule a PDSD Pre-construction meeting, SWPPP inspection or general Engineering Inspections, call IVR (740-6970), or schedule with a Customer Service Representative at the Planning Development Services Department, or contact PDSD Engineering at 791-5550 extension 2101, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html For questions, or to schedule an appointment, I can be reached at 837-4929. Jason Green, CFM Senior Engineer Associate Engineering Division COT Development Services |
12/24/2009 | TERRY STEVENS | ZONING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/11/2010 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
05/11/2010 | SUE REEVES | REJECT SHELF | Completed |