Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T09CM02359
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/23/2009 | MARTIN BROWN | FIRE | REVIEW | Approved | |
09/29/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide energy code compliance calculations for the building envelope (Pima County < 4,000 feet). Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006. |
09/30/2009 | TERRY STEVENS | ZONING | REVIEW | Denied | 09/30/2009 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site plan. Additional comments may be forthcoming. |
09/30/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A1.0: THERE WERE NO INDICATIONS ON THE PLANS THAT IBC SECTION 1107.6.2 REQUIREMENTS FOR TYPE A AND TYPE B UNITS WERE MET. INCLUDE THESE ON THE PLANS AND INDICATE THE ACCESSIBLE UNIT PER IBC TABLE 1107.6.1.1. 2. SHEET A2.1; SECTION 1/A6.4: IS THE SECTION CUT ON THE SOUTH WALL CORRECT? THE SECTION INDICATES A MASONRY WALL AND PHOTOVOLTAIC FRAMING. CLARIFY. 3. SHEET A2.1; FLOOR PLAN: REFERENCE THE BATHROOMS TO THE ENLARGED PLANS ON SHEET A7.0. 4. SHEET A2.3; GENERAL NOTES: COMPLETE NOTE 2. 5. SHEET A2.3; FLOOR PLAN: COMPLETE THE WALL SECTION CUT "X/A6.X" AT THE SOUTH WALL OF THE BUILDING. 6. SHEET A4.2; KEYNOTES: REMOVE NOTES NOT USED ON THIS PLAN. 7. SHEET A6.4; SECTION 3: PROVIDE STRUCTURAL CALCULATIONS FOR THE SUNSHADE FRAMING AND CONNECTION TO THE WALL. PROVIDE A DETAIL INDICATING SPECIFICALLY HOW THE SUNSHADE FRAME ATTACHES TO THE BENT PLATE, AND HOW THE PLATE CONNECTS TO THE WALL. SECTION IS CUT ON A2.1 AND A2.2 AT THE PHOTOVOLTAIC FRAMING, WHICH DOES NOT SHOW UP IN THE SECTION. 8. SHEET A6.4; SECTION 3: COMPLETE THE NOTE ABOVE THE SUNSHADE "DETAILS SHEET A7.X". 9. SHEET A6.7; SECTION 2: PROVIDE STRUCTURAL CALCULATIONS FOR THE PHOTOVOLTAIC STRUCTURE SUPPORT SYSTEM, INCLUDING 4" I-BEAMS, PIPE COLUMN, BASE PLATE, ANCHOR BOLTS, AND FOUNDATION. INCLUDE SECTIONS AND DETAILS AS REQUIRED. 10. SHEET A6.7; SECTION 1: PROVIDE THE CONNECTION OF THE STEEL ROD CLIP ANGLE TO THE WALL. 11. SHEET A7.0; ACCESSIBLE BATHROOM PLAN: THE TURNING CIRCLE REQUIREMENTS PER ICC/ANSI A117.1, SECTION 304, ARE NOT MET, BUT THE WATER CLOSET REQUIREMENTS PER SECTION 604 ARE MET. REMOVE THE TURNING CIRCLE FROM THE PLAN. 12. SHEET A7.0; INTERIOR ELEVATION 4(A): THE BACK WALL GRAB BAR MUST MEET ANSI FIGURE 604.5.2. REVISE. 13. SHEET A7.0; INTERIOR ELEVATION 4(B): ADD THE VERTICAL GRAB BAR AND REVISE THE HORIZONTAL GRAB BAR PER ANSI FIGURE 604.5.1. 14. SHEET A7.0; BATHROOM WALLS: THE BATHROOM WALLS MUST MEET IBC REQUIREMENTS IN SECTION 1210.2. REVISE THE ROOM FINISH SCHEDULE ON SHEET A2.2 AS REQUIRED. 15. SHEET A7.1; INTERIOR ELEVATIONS: THE ELEVATION TO THE RIGHT OF ELEVATION 4 IS MISNUMBERED. REVISE. 16. SHEETS S2.1, S2.2, AND S2.3; PLAN NOTES: COULD NOT LOCATE THE SLAB REINFORCEMENT ON THE ARCHITECTURAL DRAWINGS. COORDINATE WITH THE ARCHITECT. 17. SHEET S2.3 (FOUNDATION PLAN); STRUCTURAL CALCULATIONS (SHEET 44): THERE IS AN INTERIOR STUD WALL AND FOOTING RUNNING EAST/WEST ON THE PLAN THAT IS NOT INDICATED IN THE CALCULATIONS. IT IS INDICATED IN THE LATERAL ANALYSIS. CLARIFY. 18. SHEET S2.3 (FOUNDATION PLAN); STRUCTURAL CALCULATIONS (SHEET 44): THERE IS AN INTERIOR FOOTING (F4) ON THE PLAN THAT IS NOT INDICATED IN THE CALCULATIONS. CLARIFY. 19. SHEET S3.3; PLAN NOTES: CONCERNING NOTE 6, NO FRAMING OR CONNECTIONS WERE LOCATED ON THE ARCHITECTURAL DRAWINGS FOR THE CANOPY. COORDINATE. 20. GENERAL: ALL DEFERRED SUBMITTALS MUST BE APPROVED BY LEERAY HANLY. 21. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
09/30/2009 | ERIC NEWCOMB | ZONING HC | REVIEW | Denied | 1. SEE BUILDING COMMENTS. |
09/30/2009 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
10/01/2009 | JASON GREEN | ENGINEERING | REVIEW | Denied | Refer to site plan comments. Building plan can not be approved until an approved site plan is submitted for verification. |
10/02/2009 | ROBERT SHERRY | WATER | REVIEW | Approved | |
10/05/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. According to Tucson Water the water pressure range at the address for this activity is 66 to 73 PSI. This is also consistent with the static water pressure noted for the wet sprinkler design criteria on sheet P2.1. Revise the water pressure calculations accordingly. Reference: Section A1.1, UPC 2006 and Section 604.1, IPC 2006. 2. Revise the water pressure calculations to include the minimum required pressure commensurate with the fixtures being installed The specified water closets and water fountain require a minimum static pressure of 20 PSI. Reference: Section 604.3, IPC 2006. 3. Include the pressure drops associated with the additional water heaters and the solar collectors with the water pressure calculations. Reference: Section 610.2, UPC 2006 and Section 604.1, IPC 2006. 4. Provide cleanouts for the horizontal drains within the building, sized per Section 708.7, IPC 2006. 5. Clarify how the specified pressure vacuum breaker (Watts 800M4FR) shown in detail 2/P3.2 is to be installed in accordance with its listing. Reference: Sections 302.2, 608.13.5, and 608.15.4, IPC 2006. 6. Clarify detail 5/P3.1 which calls out "3/4" CW & HW to WH1". The detail shows a HW line from the solar water heater entering the tankless water heater and a HW line leaving the tankless water heater but no CW lines. Reference: Section 106.1.1, IBC 2006. 7. Provide the listing information for the water meters proposed for use with the solar water heaters. Reference: Section 303.2, IPC 2006. 8. Provide the listing and installation information for the solar water heaters. Reference: Section 303.2, IPC 2006 and Sections 1401, 1402, and 1404, IMC 2006. 9. Show how the hot water delivery temperature from the tankless water heaters is to be limited to a maximum of 140 degrees Fahrenheit. Reference: Section 501.6, IPC 2006. |
10/06/2009 | GERRY KOZIOL | WWM | REVIEW | Approved | |
10/07/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Denied :see comments for T09CM2360 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/22/2009 | CPIERCE1 | OUT TO CUSTOMER | Completed |
10/22/2009 | SUE REEVES | REJECT SHELF | Completed |