Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM02354
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/04/2009 | DAVE MANN | FIRE | REVIEW | Approved | |
| 09/08/2009 | DAVID RIVERA | ZONING | REVIEW | Denied | Zoning cannot approve the building plan until the Development plan has been approved by CDRC and stamped and signed by the CDRC Manager. Zoning is willing to review and approve the building plan over the counter once the DP is approved and a copy is included with the building plans. |
| 09/09/2009 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. The governing accessibility code for this project is 2006 IBC, Chapter 11 and ICC (ANSI) 117.1. Please remove all ADA references to accessibility and replace with ICC (ANSI) 117.1. 2. Please recalculate the square footage summary to include the Covered Patio. 3. Please recalculate the occupant load to include the occupants under the Covered patio. 4. For code review purposes, we added 12 occupants (as shown on the plan) for the covered patio to the calculated occupants of 16 (15.48) and used 28 occupants for toilet calculations only, not for egress requirements. a. With an occupant count more than 15 (2006 IBC, Section 2902.2), separate toilet facilities are required. b. Being a first tenant in the shell, all facilities must be accessible The existing toilet is not accessible as per ICC (ANSI) 17.1, Section 604.3.2, Fixture Overlap. Please redesign the existing toilet to be accessible as per ICC (ANSI) 117.1 or you may apply to the building official for an appeal to be reviewed as per ADAAG standards. 5. Please provide a wall section detail of the exhaust hood showing a noncombustable wall behjind the hood and a stainless steel finish on the wall. Reference mechanica1 comments. Please provide all necessary structural details and structural calculations for the support of this hood. 6. Please provide structural details and calculations for all other roof top mounted mechanical units. 7. Please provide specifications for the Water Heater. If it is wall mounted, please provide all required structural details and calculations for support. END OF REVIEW. |
| 09/10/2009 | RONALD BROWN | ZONING HC | REVIEW | Denied | Please refer to Building Comments |
| 09/11/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top units (e.g. heat pump, evaporative cooler, hood exhaust fan, grease hood). Reference: Sections 302.1 and 507.6, IMC 2006. 2. Provide the installed weights of the rooftop equipment (e.g. evaporative cooler, hood exhaust fan, grease hood). and its associated ductwork. Reference: Section 106.3.1, IMC 2006. 3. Provide information on the sequence of operation for the restroom exhaust fans to show that recirculation of the air from the restrooms will not occur. Reference: Section 403.2.1, IMC 2006. 4. Provide information regarding the construction of the walls adjacent to the grease hood. Reference: Section 507.9, IMC 2006. 5. Provide energy code compliance calculations. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006. |
| 09/11/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | The applicable code for all commercial plumbing projects is the 2006 Uniform Plumbing Code with Local Amendments. Provide an approved appeal to the building official if the plans are to be reviewed to the 2006 IPC. |
| 09/11/2009 | ROBERT SHERRY | WATER | REVIEW | Denied | 1. Show the location of the existing water meter and backflow preventer. Reference: Section 103.2.3, UPC 2006. 2. If this building is not the only building served by the existing water meter, provide the total connected demand served by the existing water meter. Reference: Sections 103.2.3 and 610.1, UPC 2006. |
| 09/16/2009 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
| 09/22/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Project: 8991 E Tanque Verde, TI Restaurant T09CM02354 The Electrical Plans have been denied for the following; 1. Sheet E-3 note #10 indicated to refer to the Mechanical Plans for interlock information on the make up air system. The Mechanical Sheet M-1 indicates on note #5 that there is to be a mechanical interlock, however a diagram of how this will be accomplished is required on the Electrical Plan. 2. Circuit 8 is not shown on the power plan. 3. Provide a maintanance receptacle for the AC equipment on roof or indicate on exist. Ray T Majuta Elect Plan Ck,PSDS-- City of Tucson 9/23/09 Ray.majuta@tucsonaz.gov |
| 09/24/2009 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 09/28/2009 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/28/2009 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 09/28/2009 | SUE REEVES | REJECT SHELF | Completed |