Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T09CM02318
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/07/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Comment not resolved. Section 1101.11.2.1, UPC 2006 calls for the scupper to have a minimum width equal to the circumference of the required roof drain as determined with Table 11-1, UPC 2006. The minimum scupper height shall be 4". (The policy for the City of Tucson will allow the scupper to also serve as an overflow if the scupper height is increased to 6".) If you wish to use a circular scupper, submit an appeal to the building offical and provide the calculations that show it will have performance at least equivalent to the code-minimum scupper. 2. The "concealed internal temperature control mixer" will not guarantee a maximum temperature of 110 degrees Fahrenheit. Provide an ASSE listed device to control the water temperature. |
10/16/2009 | THAUSER1 | WWM | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/16/2009 | THAUSER1 | OUT TO CUSTOMER | Completed |