Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T09CM02318
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/31/2009 | DAVE MANN | FIRE | REVIEW | Approved | |
08/31/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide fixture descriptions for all plumbing fixtures. All plumbing fixtures and fittings shall be listed or labeled by a nationally-recognized, accredited conformity assessment company (e.g. UL, ETL, NSF, UPC, etc). Reference: Sections 301.1.1 and 401.1, UPC 2006. 2. Provide a floor drain in the restroom. Reference: Section 305.0, UPC 2006. 3. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006. 4. Provide an expansion tank or other approved device for controlling thermal expansion for storage-type water heaters. Reference: Section 608.3, UPC 2006. 5. Provide calculations to show that the proposed scupper can accommodate the design rainfall without exceeding a 2" depth of flow as well as provide overflow capacity or provide structural calculations to show that the roof is capable of supporting the additional rain load. Reference: Sections 1101.11.1 and 1101.11.2.1, UPC 2006, and Section 1611.1, IBC 2006. |
08/31/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
08/31/2009 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
08/31/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. PROVIDE CALCULATIONS FOR VERTICAL AND LATERAL ANALYSIS FOR BUILDING, INCLUDING FRAMING AND FOUNDATIONS. |
08/31/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide the capacity of the proposed ventilation fan and indicate how it will be ducted out of the building. |
08/31/2009 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
08/31/2009 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
08/31/2009 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
08/31/2009 | ERIC NEWCOMB | ZONING HC | REVIEW | Denied | 1. SEE BUILDING COMMENTS. |
09/21/2009 | CAGUILA1 | WATER | REVIEW | Needs Review | |
09/21/2009 | CAGUILA1 | WWM | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/21/2009 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |