Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM02299
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/28/2009 | DAVE MANN | FIRE | REVIEW | Approved | |
08/31/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Project; 5151 E Broadway Bl #105 T09CM02299 TI Post Secondary ED The Electrical Plans have been denied for the following; 1. Sheet E-5 is showing several circuits marked EGP-14,16,18,20,22, which do not appear on the Panel Schedule. 2. Sheet E-11 shows two Panels marked EGP. Ray T Majuta Elect Plan Ck PDS City of Tucson 9/1/09 Ray.Majuta@tucsonaz.gov |
09/02/2009 | GERRY KOZIOL | WWM | REVIEW | Approved | |
09/03/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. GENERAL: A MINIMUM OF 3/32" HIGH LETTERING IS REQUIRED ON ALL DRAWINGS (SHEETS A-1.0, A-1.1, A-1.2, AND A-1.3). REVISE. 2. GENERAL: PROVIDE AN ANALYSIS ON THE DRAWINGS INDICATING THAT THE PLUMBING SYSTEMS REQUIREMENTS (COMBINED NEW AND EXISTING) PER THE IBC ARE ADEQUATE FOR THE NEW OCCUPANT LOADING IN THE EAST AND WEST WINGS. |
09/04/2009 | ERIC NEWCOMB | ZONING HC | REVIEW | Denied | 1. SEE BUILDING COMMENTS. |
09/04/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Coordinate the West Wing Plumbing Schedule with the floor plans for the number of fixtures shown on the floor plans. Reference: Sections 103.2.3 and 610.1, UPC 2006. 2. Clarify why the waste water fixture units for the existing fixtures have been omitted from the plumbing schedules. Reference: Section 13.2.3, UPC 2006. 3. Clarify why the water and waste water fixture units from the plumbing demo schedule for the west wing have been subtracted from the fixture units for the new and the retained existing fixtures. Reference: Section 13.2.3, UPC 2006. |
09/04/2009 | ROBERT SHERRY | WATER | REVIEW | Approved | |
09/04/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top units. Reference: Section 302.1, IMC 2006. 2. Provide a description of the occupancy category used for each room in the ventilation calculations to justify the occupant densities and combined outdoor air rates used in the ventilation calculations. Reference: Sections 106.3.1 and 403.2, IMC 2006, as amended by the City of Tucson; ASHRAE Standard 62.1-2004. 3. Note that materials exposed in plenums shall conform to Section 602.2.1, IMC 2006 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/08/2009 | DELMA ROBEY | OUT TO CUSTOMER | Completed |