| 09/11/2009 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 09/16/2009 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | GENERAL 1. Sheet A9 has been printed with a screened font and is difficult to read. Please reprint with full ink blackness. 2. The General Notes on Sheet A-8 has font sizes less than 3/32. Please change all lettering fonts to a minimun of 3/32 and reprint sheet. SITE PLAN 4. Please provide new underground gas and electrical distribution on Proposed Addition Site Plan. Also show new location of electrical meter. FLOOR PLAN 5. Specify fiber-cement board backing for all tub and shower locations, R702.4.2. STAIRS 6. Reference detail 1/A7 and 1 and 2 A/3 Floor Plans: The walls and soffit of the enclosed space under stairs shall be protected on the enclosed side with ½" gypsum board, R311.2.2. FOUNDATION PLAN 7. Provide a note for termite treatment, R320 as amended. STRUCTURAL FRAMING PLANS 8. Provide a header/CMU lintel schedule consistent with Table 502.5(1) or specify size of steel lintels and CMU lintels. ELEVATIONS 9. Specify height above grade for finished floor, windows/doors, exterior walls, rooflines, porches, chimneys, etc. 10. For thin-coat stucco systems, indicate the ICBO #, system name, and vapor barrier, R703.6. 11. Specify roofing type, grade of materials, and method of installation, R905. a. Built-up: min slope ¼” per foot, R905.9.1. SECTIONS - DETAILS 12. Stucco: Show weep screeds with a min. clearance 4” above grade or 2" above paved areas, R703.6.2.1. 13. Welded connections require special inspections. If used, a special inspection request must be included with the permit application, UAC306.1.5. Provide the same for other special inspections called for in the structural inspections. 14. Specify wall and ceiling covering. Note: Ceiling gypsum board must be either 5/8” or ½” sag resistant when applied to ceilings framed at 24” o/c, IRC table R702.3.5 footnote d. ELECTRICAL PLANS 15. Electrical work shall comply with 2006 IRC chapters 33 - 42. 16. Provide an electrical riser diagram with grounding method and bonding to metallic piping, E3303, E3507. Show an underground service entrance on the Riser Diagram or complete the Underground Electrical Service Wavier form. 17. Gas lines shall not be used as the primary grounding method, E3508. 18. Provide riser diagrams for sub-panels with feeder conductors, conduit sizes, and over-current protection (with appropriate correction factors), E3605.5. 19. TEP requires a 2½" diameter service conduit, TEP SR-305. 20. Provide equipment rated for 22,000 AIC short circuit protection when the underground cable length is less than 45 feet, 2006 Electric Service Requirements TEP SR-510. 21. Provide feeder load calculations for sub-panels (40% demand factor may not be applied), E3604.3. 22. Provide a panel schedule: panel size, circuit numbers, ampacity, and wire sizes, E3304.11, E3606.2. 23. Show the location of the panel with a 30"W x 36"D clear working space, E3305.2, E3501.6.2. PLUMBING PLANS 24. Provide pressure and temperature relief valve terminating to the exterior facing down between 6 and 24 inches above grade, UPC 608.5. If this is not possible because both water heaters are located in the basement provide a Petition of Appeal to releave p/t valve pressure to a container or to the floor of the basement. 25. Please note Water conservation requirements: Water closets = 1.6 gallons per flush, Sinks/ Showerheads = 3 gpm, UPC State Amend. 45-312. 26. Isometric drawing of Drain, Waste and Vent (DWV) system required for multiple stories. 27. Please note that condensate disposal may not discharge into a plumbing vent, UPC 908.1. 28. Provide a gas line isometric and size the supply pipe for the connected demand. Include the length of line and BTU demand for each appliance, size of each branch, total demand, and total developed length from meter to the most remote appliance on the system, UPC 1217.0 Table 12-8. 29. Sleeves are required when a gas line passes through concrete, UPC 1211.1.5. MECHANICAL PLANS 30. Plans are not complete. Please finish all drawings and show referenced notes and equipment not shown nor located. Designate the location, capacity and fuel type of the heating and air conditioning equipment. Show all HVAC equipment on the drawings for permint installation. 31. Show the condensate line and secondary for HVAC unit, M1411.3. OUTDOOR LIGHTING CODE 32. Provide cut sheets for all FCO fixtures showing the angle of cutoff, light emissions and fixture wattage. All other fixtures are assumed to be unshielded (non-FCO style). INTERNATIONAL ENERGY CONSERVATION CODE 33. Provide a note requiring the insulation certificate shall be posted in the electrical distribution panel before final inspection, N1101.8. SOLAR WATER HEATER SYETEM 34. The Solar Water Heater design has been submitted (Sheet S1) with these drawings for permit. Please remove the note on detail 2/A3 referring to it as designed by others. END OF REVIEW |
| 09/16/2009 | RONALD BROWN | BUILDING-RESIDENTIAL | REVIEW | Denied | reference building comments |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/23/2009 | DELMA ROBEY | OUT TO CUSTOMER | Completed |