Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - SITE
Permit Number - T09CM02029
Review Name: RESUBMITTAL - SITE
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/13/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
11/16/2009 | STEVE SHIELDS | ZONING | REVIEW | Denied | PLANNING AND DEVELOPMENT SERVICES DEPARTMENT TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Cherry Avenue Center T09CM02029 Site Plan (3rd Review) TRANSMITTAL DATE: November 16, 2009 COMMENTS: Please resubmit revised drawings and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. This site plan was reviewed for compliance with the City of Tucson Development Standards (D.S.) and Land Use Code (LUC) for full code compliance due to a greater than 25% expansion of building area. 2. The waiver must be approved prior to approval of the site plan. Provide a copy of the approved waiver with your next submittal. D.S. 2-02.2.2.A.4 Based on the provided vehicle parking space calculation 178 required and 64 provide A Board of Adjustment for Variance maybe required. 3. This comment was not addressed. D.S. 2-02.2.2.A.4 The bicycle parking calculation is not correct. Per LUC Section 3.3.4 RECREATION USE GROUP, Neighborhood Recreation; Recreation the required number of bicycle parking spaces is based on 15% of the provided vehicle parking spaces, all Class 2. Revise the calculation to show the 15% required. 4. Depending on how the above comments are addressed addition comments may be forth coming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956. C:\planning\site\t09cm02029 RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan. |