Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T09CM02023
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/30/2009 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 08/04/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET S-1; FOUNDATION PLAN: SECTION REFERENCE 1/A3 ALONG THE EAST WALL IS NOT CORRECT. REVISE. 2. SHEET D-1; BASE PLATE SCHEDULE: BASE PLATE THICKNESSES ARE DESIGNED IN THE CALCULATIONS, BUT NOT LISTED IN THE SCHEDULE. CLARIFY. 3. SHEET A-5: PROVIDE STRUCTURAL CALCULATIONS FOR THE EVAPORATIVE COOLER SUPPORTS. PROVIDE DETAILS AS REQUIRED. 4. SHEET A-1: PER OUR PHONE CONVERSATION, ADD MAN DOOR TO THE SOUTH WALL FOR EACH SPACE (3 TOTAL EXITS FOR THE SHELL BUILDING) FOR EXITING PURPOSES. |
| 08/05/2009 | ERIC NEWCOMB | ZONING HC SITE | REVIEW | Denied | 1. SEE BUILDING COMMENTS. |
| 08/10/2009 | RMYERS1 | WATER | REVIEW | Denied | 1. Provide the size of the existing water meter and the total connected water demand that will result from the addition of this activity. Include the demand due to the three evaporative coolers in addition to the plumbing fixtures. Reference: Sections 610.1 and 610.2, UPC 2006. 2. Reduced pressure backflow prevention assemblies are required at the water meter for multi-use commercial buildings. Show the size and location of the reduced pressure backflow prevention assembly on the drawing. Reference: Section 103.2.3, UPC 2006 and COT Ordinance 9976, http://www.tucsonaz.gov/water/docs/backflow-ord.pdf |
| 08/11/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Show how the foundation of the new storage building will clear the building sewer from the adjacent office building. Reference: Section 313.3, UPC 2006. 2. Provide freeze protection for the exposed water supplies to the evaporative coolers. Reference: Section 313.6, UPC 2006. 3. Provide roof drainage calculations and plans. Reference: Section 1101.11.1, UPC 2006. |
| 08/12/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide guards around the evaporative coolers per Section 304.10, UPC 2006. 2. Show the size, route, and termination of the drains from the evaporative coolers. Reference: Sections 106.3.1 and 304.1, IMC 2006. |
| 08/20/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | See comments for T09CM02021, per Ray T Majuta, 8/22/09 |
| 08/26/2009 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Cupps Industrial Supply T09CM02020, T09CM02021, T09CM02023, T09CM02027 Building Plan (1st Review) TRANSMITTAL DATE: August 26, 2009 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site plan with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t09cm02020.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/26/2009 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 08/26/2009 | SUE REEVES | REJECT SHELF | Completed |