Permit Review Detail
Review Status: Active
Review Details: RESUBMITTAL
Permit Number - T09CM02021
Review Name: RESUBMITTAL
Review Status: Active
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/15/2009 | ANY | BUILDING-COMMERCIAL | REVIEW | Active | |
| 10/15/2009 | ANY | ELECTRICAL-COMMERCIAL | REVIEW | Active | |
| 10/16/2009 | ROBERT SHERRY | WATER | REVIEW | Denied | Provide a letter from Tucson Water confirming that the use of a 5/8" water meter will be allowed for this project with a demand of 15 GPM. |
| 10/16/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
| 10/19/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Sheet P1 indicates a 1-1/4" water service to the buildings but sheet P2 shows a 1" water service to the buildings. Clarify the size of the water service pipe. 2. Tucson Water does not provide ¾" water meters; only 5/8" meters. Correct the meter size on the drawings and include the correct pressure drop due to the meter on the water pressure calculations. 3. Comment not addressed. Clarify how the storm water draining from the scuppers on the south side of the suite is to be diverted away from the building foundations. Reference: 103.2.3, UPC 2006 and Section 1803.3, IBC 2006. 4. Comment not addressed. The eastern scupper of this suite is shown as handling approximately 148 square feet of roof along with 655 square feet of contributing roof area for a total of 803 square feet. Based on this effective roof area, a 3" roof drain is required by Table 1-1, UPC 2006. The minimum required scupper width will be approximately 9.4", not 8" as specified on sheet S-2. Reference: Section 1101.11.2.1, UPC 2006. |
| 10/22/2009 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Cupps Industrial Supply T09CM02020, T09CM02021, T09CM02023, T09CM02027 Building Plan (2nd Review) TRANSMITTAL DATE: October 22, 2009 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site plan with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t09cm02020.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: |