Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T09CM01937
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/04/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The submitted structural calculations and description of the water heater platform are fine but the construction information included with the calculations needs to be included on the drawing. Reference: Sections 310.0 and 314.5, UPC 2006. 2. The submitted water supply calculations indicate that some of the water piping has been undersized (e.g. a 1" pipe serving over 18 fixture units, a ½" pipe serving over 1 fixture unit). Reference: Sections 610.4 and 610.5, UPC 2006. 3. Floor sinks and floor drains can't be connected to a hydromechanical grease interceptor because the external flow control device for a hydromechanical grease interceptor is required to be installed in a location that is readily accessible and visible. (Note that a sanitizing compartment is not normally connected to a hydromechanical grease interceptor.) Reference: Section 1014.2.1, UPC 2006. 4. A trap and a vent are required for all fixtures discharging into a grease interceptor. Reference: Section 1014.1.2, UPC 2006. 5. Show how the water-cooled ice maker (#17) conforms to Section 1201.3, IMC 2006 as amended by the City of Tucson |
| 08/04/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/06/2009 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 08/06/2009 | SUE REEVES | REJECT SHELF | Completed |