Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T09CM01847
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/07/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Each fixture trap requires a vent. Reference: 1002.1 2006 UPC. See sheet 3.1 Enlarged Waste and Vent Plan: floor drain adjacent to mop sink. 2. See sheet P8.0 Electric water heater diagrams. Reference: 608.7 2006 UPC. Where a water heater storage tank or an indirect water heater is located at an elevation above the fixture outlets in the hot water system, a vacuum relief valve shall be installed on the storage tank or water heater. 3. See sheet P8.0 Plumbing Fixture Spec's BFP 1. Unable to locate BFP on plan. Show location of device, and type of equipment it is to be connected to. 4. See sheet P 7.1 waste and vent isometric. Water closets and urinals have different discharge elevations. Show how the urinal is to be wet vented into the water closet vent. Reference: 908.2 2006 UPC. 5. See sheet P2.1 Plumbing Plan. Floor drain at columns G-4.5. A fixture trap located within the trap arm distance to an adjacent partition, shall be vented conventionally. Horizontal venting below the flood rim is limited to structural conditions. Reference: 905.3 2006 UPC. 6. The submitted water pressure calculations do not support the size of water piping to the fixtures. It appears that the system has been designed for flush tanks. It needs to be designed for flush valves. Reference: Section 610.1, UPC 2006. 7. Provide roof drainage calculations and plans. All roof areas shall be drained by roof drains, scuppers, or gutters. Reference: Section 1101.11.1, UPC 2006. 8. Show how the temperature is to be controlled at the public use lavatories. Reference: 413.1 2006 UPC. 9. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006. |
01/08/2010 | ROBERT SHERRY | WATER | REVIEW | Approved | |
01/08/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Comment not resolved; no calculations have been included and nothing in the drawing set shows how the slab insulation will be installed. Provide energy code compliance calculations. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006. 2. Clarify how the economizer configuration for the fan coils (detail on M2.2) can be successfully balanced without a relief fan. Reference: Section 403.3.4, IMC 2006 and Section 503.3.1, IECC 2006. 3. Comment not resolved. Detail 7/M6.0 shows the fan coil units suspended from the building structure but does not specify how the connection to the structure will be made. Reference: Sections 106.3.1 and 302.1, IMC 2006. 4. Item not resolved; the ducts appear to obstruct access to the new access panel and EHW-2 is still located in the same space. Show how adequate access is being provided for the fan coil units located above the ceiling (show also how EHW-2 will fit in the same space as AHU-2). Reference: Section 306.3, IMC 2006. 5. Comment not resolved. The ventilation table shown on sheetM2.2 does not provide sufficient information to evaluate the ventilation for the building. Show the area of each occupancy type and how the number of people in each occupancy type was determined (e.g. Table 403.3, IMC 2006). Provide calculations demonstrating adequate ventilation. Reference: Section 403, IMC 2006. |
12/17/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
12/17/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
12/17/2009 | ERIC NEWCOMB | ZONING HC | REVIEW | Approved | |
12/21/2009 | GERRY KOZIOL | WWM | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/09/2010 | SUE REEVES | OUT TO CUSTOMER | Completed |
02/09/2010 | SUE REEVES | REJECT SHELF | Completed |