Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM01667
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/07/2009 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
| 07/14/2009 | JIM MILITELLO | MECHANICAL-COMMERCIAL | REVIEW | Needs Review | |
| 07/14/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
| 07/14/2009 | JMILITE1 | WATER | REVIEW | Approved | |
| 07/14/2009 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. provide structural calulations for all roof top mechanical units. |
| 07/14/2009 | JIM MILITELLO | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
| 07/14/2009 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 07/14/2009 | RONALD BROWN | ZONING HC SITE | REVIEW | Denied | 1. provide proper ewc clearance as per section 602. 2. demo plan shows to remove rr 1 and 2 toilet fixtures and architectural plan shows to remain. please verify. 3. at boys and girls gang toilets, provide 42 inch clearance to accessible toilet stall. plan shows 38 inches. 4. verify accessibility of existing urinal to remain. 5. verify clearances at lavatory at boys and girls #2 toilets. 6. doors #4 and 5 provide 18 inch strike clearance. 7. provide large scale toilet floor plan and interior elevations showing all accessability accessories and critical dimenions. 8. clarify 2 hour seperation wall on floor plan. 9. correct toilet signage location as per section 703.311 end of review. |
| 07/14/2009 | RONALD BROWN | ADA | REVIEW | Passed | |
| 07/16/2009 | CAGUILA1 | WWM | REVIEW | Needs Review | |
| 07/16/2009 | CAGUILA1 | FIRE | REVIEW | Needs Review | |
| 07/16/2009 | CAGUILA1 | ENGINEERING | REVIEW | Needs Review |