Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: T09CM01513
Parcel: 10512024E

Address:
4070 N ORACLE RD

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T09CM01513
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/15/2009 DAVE MANN FIRE REVIEW Approved
06/17/2009 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Complete recirculation of ventilation air from toilet rooms is prohibited. Reference: Section 403.2.1 (3), IMC 2006.
06/17/2009 RICK HOLLANDER ELECTRICAL-COMMERCIAL REVIEW Denied Project: T09CM01513
4070 N. Oracle Rd
TI



Need more information regarding existing circuits, and key notes 1 & 3


Rick Hollander
DSD Electrical Plan Check
6/17/2009, 520-837-1088
06/17/2009 ROBERT SHERRY WATER REVIEW Approved
06/17/2009 RONALD BROWN BUILDING-COMMERCIAL REVIEW Approved
06/17/2009 JASON GREEN ENGINEERING REVIEW Approved
06/17/2009 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Specify the materials to be used for the waste, vent, and water piping and fittings. Reference: Sections 604.0 and 701, UPC 2006.
2. The fixture connection sizes called out for the flush valves will result in water velocities greater than 8 FPS. Limit the water velocity to less than 8 FPS if copper piping is to be used. Reference: Section A 6.1, UPC 2006 and IS 3-2003, Section 2.6.
3. Provide pressure-absorbing devices for the water connections to appliances equipped with quick-acting or solenoid valves. Reference: Section 609.10, UPC 2006.
4. Provide water pressure and water pipe sizing calculations. Show the sizes of the pipes on the riser diagram. Reference: Section 610.1, UPC 2006.
5. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006.
06/17/2009 MICHAEL ST. PAUL ZONING REVIEW Approved
06/17/2009 RONALD BROWN ZONING HC SITE REVIEW Approved
06/17/2009 RONALD BROWN ADA REVIEW Passed NOT A COT OWNED/OPERATED PROPERTY
07/08/2009 GERRY KOZIOL WWM REVIEW Approved
07/08/2009 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
07/08/2009 DELMA ROBEY OUT TO CUSTOMER Completed