Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - SITE ALL
Permit Number - T09CM01454
Review Name: RESUBMITTAL - SITE ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/30/2009 | DAVE MANN | FIRE | REVIEW | Approved | |
| 07/31/2009 | TERRY STEVENS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Terry Stevens Lead Planner PROJECT: T09CM01454 2502 N. 1st Ave. Site Plan TRANSMITTAL DATE: 07/31/09 COMMENTS: Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. DS 2-02.2.1.10 Provide the location of the future sight visibility triangles and future curb location along 1st Ave. Provide the building setback from 1st Ave. measured from the back of future curb. 2. DS 2-02.2.1.12 The sidewalk provided along the north side of the property cannot connect to the side of the handicap ramp located in the right of way. Revise 3. The above comments are minor in nature and can be reviewed over the counter by setting an appointment with me. If you have any questions about this transmittal, please call Terry Stevens, (520) 837-4961 C:\planning\cdrc\DSD\T09CM01454-2.doc |
| 08/03/2009 | RONALD BROWN | ZONING HC SITE | REVIEW | Denied | 1. The most Northerly concrete accessible route can not connect to the 1st Av Public right of way pedestrian way at the side of a ramp. Please redesign so the connection is to a flat surface concrete walk section at the right of way. 2. The most Northerly sidewalk ramp at the most Northerly marked crossing: a. It does not comply with ICC/ANSI 117.1, Section 405.7, needs a 5 x 5 landing for 90 directional changes. b. The detectable warning is loacted in the wrong position. As per ICC/ANSI 117.1, Section 406.13, the 2' width shall be in the direction of travel. END OF REVIEW |
| 08/11/2009 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Denied | DATE: August 11, 2009 SUBJECT: Site Plan TO: Repp Design & Construction LOCATION: 2502 N 1st Ave, 13S 14E Section 31, Ward 3 REVIEWERS: Bianca Ramirez, CFM ACTIVITY: T09CM01454 (Second Review) RESUBMITTAL REQUIRED: Site Plan SUMMARY: Engineering Division of Development Services Department has received and reviewed the proposed site plan for the above referenced property. Engineering Division does not recommend approval of the site plan at this time. Please address the following review comments prior to the next submittal. Please include a response letter to the comments along with the corrected copies of the site plan with the next submittal. Site Plan: 1. Verify that all necessary sight visibility triangles are correctly indicated on site plan per D.S. 2-02.2.1.10. 2. Complied. 3. Complied 4. DS Sec.2.02.2.1.A.16: Provide roof drainage arrows and locations of all concentration points. Specifically show roof down spout locations proposed buildings at pedestrian circulation areas. A detail for the dimension of the proposed scuppers that are used for collecting onsite roof drainage at all pedestrian sidewalk is required; refer to City of Tucson details. Any scuppers proposed under the sidewalk will be designed and constructed to convey the 10-year flood flow. Provide a drainage statement showing scupper calculations that demonstrate that the 10-year flood flow is contained under the sidewalk. Acknowledge that 4" bleeder pipe is being installed. Recommend 12" pipe with clean out approximately in the center and smaller orifice (4") from downspout to the 12" pipe. 5. Complied. 6. Complied 7. Complied 8. Complied 9. Complied 10. DS Sec.2-02.2.1.A.19: Dimension existing sidewalk and curb area on the site plan to verify that all improvements are located outside of the existing ROW. 11. Complied 12. All easement of record must be graphically shown on the plan together with recording docket and page per D.S. 2-02.2.1.20. Provide docket and page for easements identified on site plan. Note: Standard Comment 13. Please provide existing topographic contours at intervals not exceeding two (2) feet and/or spot elevations as pertinent and Bench Mark based on City of Tucson Datum, including City Field Book and page number per D.S. 2-02.2.1.23. Provide contour interval on plan. Changes noted - Provide contour elevation on site plan identifying the elevation of each of the identified contours. 14. Verify that all fences, walls, or vegetation for screening and sight visibility are indicated by type, material, height, location and spacing per D.S. 2-02.2.1.27. Note: Standard Commment 15. Provide the site plan activity number in the lower right hand corner of each sheet per D.S. 2-02.2.1.29. 16. A permit or a private improvement agreement will be necessary for any work performed within the Right-of-way. Contact Permits and Codes at (520) 791-5100 for permit information. Note: Standard Comment 17. Complied 18. See note for comment 4. 19. Complied 20. Complied 21. Complied 22. Complied 23. Within key notes identify the appropriate Development Standard. 24. Trash enclosure cannot be accessed from right of way get approval from Environmental Services and the Department of Transportation. Provide approval letter from Environmental Services with next submittal. 25. Complied 26. Additional comments may be forthcoming. If you have any questions, I can be reached at 837-4928 or Bianca.Ramirez@tucsonaz.gov Bianca C. Ramirez Engineering Associate City of Tucson/Development Services Department 201 N. Stone Avenue P.O. Box 27210 Tucson, Arizona 85726-7210 (520) 837-4928 office (520) 879-8010 fax |
| 08/18/2009 | JOE LINVILLE | NPPO | REVIEW | Approved | exception |
| 08/18/2009 | JOE LINVILLE | LANDSCAPE | REVIEW | Denied | 1) New development is required to provide on-site refuse storage, collection, and pickup areas with service access from within the tract or from an alley adjacent to the tract. A DSMR is required to modify this standard. DS 6-01.4.1.A & I. |
| 08/21/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/25/2009 | CPIERCE1 | OUT TO CUSTOMER | Completed |
| 08/25/2009 | SUE REEVES | REJECT SHELF | Completed |