Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM01411
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/05/2009 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 06/08/2009 | DAVE MANN | FIRE | REVIEW | Approved | |
| 06/08/2009 | RONALD BROWN | ADA | REVIEW | Passed | NOT A COT OWNED/OPERATED PROPERTY |
| 06/08/2009 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. New steel storage unit needs to be on a minimum of 4" concrete slab with welded wire fabric reinforcing. 2. Need to apply to the state for a premanufactured building placement permit. 3. As per 2006 IBC, Section 3409.7, the route to the altered primary function shall be accessible and the costs of this accessibility are to be no more than 20% of the construction costs. The exact area of accessible up grades are as per Owner's selection. We do reccommend making the parking lot 100% accessible before upgrading the interior. a. Please provide a budget cost breakdown showing percentages spent on accessibility up grades. b. Site up grades could be detectable warnings placed at the marked crossing from the accessible parking as per ICC/ANSI 2003 Edition, Sectio 406.12 and 406.14. c. Another area for site accessibility is to provide an accessible passenger loading zone as per Chapter 1106.7 and ANSI 117.1, section 503. END OF REVIEW |
| 06/08/2009 | RONALD BROWN | ZONING HC SITE | REVIEW | Denied | REFERENCE BUILDING COMMENTS |
| 06/09/2009 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Canyon Rose Academy High School. T09CM01411 Building Plan (1st Review) TRANSMITTAL DATE: June 9, 2009 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan.. Please submit two copies of the approved and stamped site plan with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t09cm01411.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: |
| 06/23/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide calculations demonstrating adequate ventilation for the revised area. Reference: Section 403.1, IMC 2006. |
| 06/23/2009 | RICK MYERS | PLUMBING-COMMERCIAL | REVIEW | Denied | provide plumbing plans for demo and new work |
| 06/23/2009 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 06/24/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 06/26/2009 | GERRY KOZIOL | WWM | REVIEW | Passed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/23/2009 | THAUSER1 | OUT TO CUSTOMER | Completed |
| 07/23/2009 | SUE REEVES | REJECT SHELF | Completed |