Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: POST 3RD PARTY REVIEW
Permit Number - T09CM01358
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/09/2009 | DAVE MANN | FIRE | REVIEW | Approved | |
11/10/2009 | GERRY KOZIOL | WWM | REVIEW | Approved | |
11/10/2009 | ROBERT SHERRY | WATER | REVIEW | Denied | 1. Provide a vacuum relief for storage-type water heaters located above any fixture outlets. Reference: Section 608.7, UPC 2006. 2. The flow control device for the specified hydromechanical grease interceptor (J. R. Smith #8050) shall be installed in a location that is readily accessible and visible. Reference: Section 1014.2.1, UPC 2006. 3. The discharge of the two 4" roof drains (approximately 150 GPM in a 3" per hour rainstorm) and the overflow drains at the east side of the building with a masonry wall 2'-9" away from the building appears to be contrary to the intent of Section 1803.3, IBC 2006 and Sections 1101.1 and 1101.11.2.2.1, UPC 2006. Show how the storm water is to be directed away from the foundation of the building. |
11/13/2009 | TERRY STEVENS | ZONING | REVIEW | Denied | 11/13/2009 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site plan. Additional comments may be forthcoming. |
11/16/2009 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | Impact Fee's Do Apply; Central District; 4,450 Square Foot Merchantile Building; $20,181.80 Demolition Credits maybe available once demolition permits have been secured. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/19/2009 | CPIERCE1 | OUT TO CUSTOMER | Completed |
11/19/2009 | SUE REEVES | REJECT SHELF | Completed |