Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T09CM01357
Parcel: 127022500

Review Status: Active

Review Details: RESUBMITTAL - SITE

Permit Number - T09CM01357
Review Name: RESUBMITTAL - SITE
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
07/22/2009 STEVE SHIELDS ZONING REVIEW Approv-Cond DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Circle K @ Speedway & Mognolia.
T09CM01357
Site Plan Conditional Approval

TRANSMITTAL DATE: July 22, 2009

COMMENTS: Please resubmit revised drawings and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. This site plan was reviewed for compliance with the City of Tucson Development Standards (D.S.) and Land Use Code (LUC) for full code compliance.

2. Zoning acknowledges you comment response. The lot combination/lot split will need to be approved prior to approval of the site plan. It appears that there is some type of lot combination/lot split proposed. Please clarify what is proposed. The lot combination/lot split will need to be approved prior to approval of the site plan.

3. Based on the pedestrian/vehicle access proposed across the parcel to the east this site will act as a single site. This said a Covenant Regarding Development and Use of Real Property will need to be recorded and the following note provide on the site plan, "COVENANT REGARDING DEVELOPMENT AND USE OF REAL PROPERTY RECORDED UNDER DOCKET _____, PAGE _____.

4. D.S. 2-02.2.1.A.13 The proposed sign shown within the future sight visibility triangle will require an approved Development Standards Modification Request (DSMR) prior to approval of the site plan. If the DSMR is approved on the plan provide: DSMR Number, Date of Approval, what was approved, and any conditions of approval.

5. This easement will need to be abandoned prior to approval of the site plan. D.S. 2-02.2.1.A.20 There is a "16' ELEC. ESMT." called out on the plan that runs under the proposed building. This easement will need to be abandoned prior to approval of the site plan.

6. The proposed pedestrian circulation/accessible route and vehicle access PAAL located on the parcel to the east require a pedestrian/vehicle access easement be recorded prior to approval of the site plan. Provide the docket and page on the plan.

7. The proposed dedication of public right of way will need to be completed prior to approval of the site plan.

8. Once the above comments have been addressed the site plan can be fully addressed.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956.

C:\planning\site\t09cm01357

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents.
07/22/2009 RONALD BROWN ZONING HC SITE REVIEW Approved
07/22/2009 PAUL MACHADO ENGINEERING REVIEW Approved