| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/28/2009 | DAVE MANN | FIRE | REVIEW | Approved | |
| 05/29/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SEE BUILDING COMMENTS FOR T09CM01333. |
| 06/02/2009 | ERIC NEWCOMB | ZONING HC SITE | REVIEW | Denied | 1. SEE BUILDING COMMENTS FOR T09CM01333. |
| 06/04/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Clarify how the energy compliance notes on sheet M-3 comply with the prescriptive requirements from Table 402.1.1, IECC 2006 for ceilings and fenestration or provide documentation to show that the energy performance of the building complies with the requirements of Section 404, IECC 2006. Coordinate the wall and ceiling construction with the architectural notes and sections on sheets A-5, A-6, A-7, A-8, A-9, A-11, A-12, A-13.1, and A-13.2. 2. Provide information to show that condensate will not form on the exterior of any duct and, in the case of ducts or plenums constructed of gypsum board, that the surface temperature of the gypsum board will remain above the airstream dew-point temperature. Reference: Sections 603.5.1 and 603.12, IMC 2006. |
| 06/05/2009 | RICK MYERS | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Reference 608.3 2006 UPC Any water system provided with a backflow preventer shall be provided with an approved, listed, and adequetely sized expansion tank or other approved device having a similar function to control thermal expansion. 2. Show the pressure relief piping on the discharge of the hot water piping of the tankless water heater, as required by the manufacturer's installation standard. 3. Reference 710.1 2006 UPC Where a fixture is located on a floor level that is lower than the next upstream manhole cover of the public or private sewer, serving such drainage piping, shall be protected from backflowf sewage by installing an approved type of backwater valve. 4. Reference 904.1 2006 UPC ...Vent pipes from fixtures located upstream from the backwater valve, shall not be used for meeting the cross-sectional area venting requirements of this section. |
| 06/05/2009 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | Impact Fee's Do Apply; 17,157 Square Feet of Residential Hotel with 28 Rooms; Central District; $49,045.63 Demolition Credits may be available with this project. a letter stating all demolition permits including permit numbers, description of buildings, square footage and number of rooms will be needed to process demolition credits. |
| 06/08/2009 | ROBERT SHERRY | WATER | REVIEW | Denied | Provide the listing information for the ABS pipe and fittings proposed for underground potable water piping (Sheet P-1). Reference: Section 604.1, UPC 2006. |
| 06/08/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Project: 801 W Miracle Mile Ghost Lodge Ranch Bldg #10 T09CM01334 Electrical plans have been denied for the following: 1.Provide Lighting calculation to show compliance with The City of Tucson/Pima County Outdoor Lighting Ord # 10135. 2. On the 3 phase service the power company does not pull in the service conductors from the transformer to the building, the contractor does, provide the size of conductors to be pulled in on the plan. Only on single phase installations will the power company install them. 3. Also the 2005 NEC requires the high leg to be on the B phase on the customer side, 408.3,(E), at the panel. 4. Please indicate on the plan that the 3 phase service is to be identified per NEC 110.15,230.56,408.3.E,and 409.102. Ray T Majuta Elect Plan Ck City of Tucson 520-837-4988 6/06/09 |
| 06/09/2009 | GERRY KOZIOL | WWM | REVIEW | Denied | bld # 10 9 apartment units 2: need to permit on-site private with COT 3: need DEQ review & DEQ approval to construct 8" on-site private sewer. 4: need PCRWD 3rd floor review & approval to tap exsisting manhole - 740-6369 5: need copy of on-site private sewer for base map update 6: need wastewater 5th floor credit evaluation for demo of exsisting bldgs if applicable. 740-6602/740-6606 7: need copy of on-site plan for addressing for building number review- 740-6480. |
| 06/19/2009 | DAVID RIVERA | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: David Rivera Principal Planner PROJECT: T09CM01333 and T09CM01334 801 W Miracle Mile Building Plan Review (Phase I only) (Two new buildings to replace portions of existing buildings) TRANSMITTAL DATE: June 19, 2009 Zoning has reviewed the building plans but cannot approve them at this time. The building plans must be approved by Structural review to ensure that the changes may not affect zoning requirements such as setbacks. Zoning will review the building plans on the next submittal to ensure that any changes to teh site plan has not or does affect the building plans. As of this review consistency with the proposed size and height are similar but some information missing on the site plan will be reviewed for on the next submittal to ensure compliance for both plans. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/21/2009 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 07/21/2009 | SUE REEVES | REJECT SHELF | Completed |