Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T09CM01333
Parcel: 10705126B

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T09CM01333
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/22/2009 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. PREVIOUS COMMENT: MINIMUM 3/32" LETTERING IS REQUIRED ON ALL DRAWINGS (REFER TO SHEET SGN).
2. PREVIOUS COMMENT: SHEET 99 OF THE CALCULATIONS AND SHEET S-3 SHOW BEAM WH1 (AT THE INSET AREA IN THE UPPER EXTERIOR WALL) TO BE 2-2X6, BUT SHEET 110 OF THE CALCULATIONS CALLS OUT 2-2X8. CLARIFY AND COORDINATE.
3. PREVIOUS COMMENT: SHEET SGN (MASONRY) CALLS OUT TYPICAL CMU WALL REINFORCING TO BE #4 @ 48" OC, WHILE SHEET D-2 (WALL REINFORCING SCHEDULE) INDICATES #5 @ 32" OC. CLARIFY AND COORDINATE.
4. GENERAL: PROVIDE RESPONSE LETTER TO ALL COMMENTS FOR NEXT REVIEW CYCLE.
07/22/2009 MARTIN BROWN FIRE REVIEW Approved
07/23/2009 ERIC NEWCOMB ZONING HC SITE REVIEW Approved
07/23/2009 GERRY KOZIOL WWM REVIEW Denied bld # 9 9 apartment units
2: need to permit on-site private with COT
3: need DEQ review & DEQ approval to construct 8" on-site private sewer.
4: need PCRWD 3rd floor review & approval to tap exsisting manhole - 740-6369
5: need copy of on-site private sewer for base map update
6: need wastewater 5th floor credit evaluation for demo of exsisting bldgs if applicable. 740-6602/740-6606
7: need copy of on-site plan for addressing for building number review- 740-6480.
07/23/2009 DAVID RIVERA ZONING REVIEW Denied DSD TRANSMITTAL

FROM: David Rivera
Principal Planner

PROJECT: T09CM01333 and T09CM01334
801 W Miracle Mile
Building Plan Review (Phase I only)
(Two new buildings to replace portions of existing buildings)

TRANSMITTAL DATE: July 23, 2009

Zoning has reviewed the building plans but cannot approve them at this time. The building plans must be approved by Structural review to ensure that the changes may not affect zoning requirements such as setbacks.

Zoning will review the building plans on the next submittal to ensure that any changes to teh site plan has not or does affect the building plans. As of this review consistency with the proposed size and height are similar but some information missing on the site plan will be reviewed for on the next submittal to ensure compliance for both plans.
07/24/2009 MATT FLICK ENGINEERING REVIEW Passed App'd at OK to submit stage.
07/30/2009 RICK MYERS PLUMBING-COMMERCIAL REVIEW Denied 1. the City of Tucson is currently under the 2006 UPC. Provide a Petition of Appeal for the installation of this system to be installed under the 2006 IPC. 2. A seperate permit is required for the installation of a private sewer collection system with a discharge greater than 3000 gallons a day. Private manholes are included in this permit. 3. Refer to sheet P-3 and P-4, unit "C" isometric. Only 24 DFUs permitted on a two inch vent. Reference table 7-5 2006 UPC. 4. On sheet P-1, materials note number 4, IAPMO ABS is not an approved material for potable water piping. 5. Provide the method of sterilization for the domestic water system. Reference 609.9 2006 UPC. 6. See sheet P-1 key note #2: See civil drawings for RPPBP detail. Unable to locate that detail in the civil sheets.
08/04/2009 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved
08/05/2009 ROBERT SHERRY WATER REVIEW Denied Comment not resolved. All piping used for potable water must meet the requirements of NSF 61. The title for ASTM D1795 is "Standard Test Method for Intrinsic Viscosity of Cellulose". ASTM D1785 is for PVC only, not ABS. The ASTM standards for fittings given are for PVC only. Provide the listing information for the ABS pipe and fittings proposed for underground potable water piping (Sheet P-1). Reference: Section 604.1, UPC 2006; see also Table 6-4, UPC 2006.
08/13/2009 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
08/19/2009 DELMA ROBEY OUT TO CUSTOMER Completed
08/19/2009 SUE REEVES REJECT SHELF Completed