Permit Number: T09CM01281
Parcel: 12109006A

Review Status: Completed

Review Details: RESUBMITTAL - TI ALL

Permit Number - T09CM01281
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/07/2009 DAVE MANN FIRE REVIEW Denied Sheets E-4, E-8
The Automatic fire detectors shall be smoke detector unless prohibited by ambient conditions. IFC 907.2.
08/11/2009 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. Please submit a copy of the last approved site plan.
2. As per 2006 IBC, Section 106.2, the construction documents submitted with the application for permit shall be accompanied by a site plan showing to scale the size and location of new construction and existing structures on the site, distances from lot lines, the established street grades and the proposed finished grades. In the case of demolition, the site plan shall show construction to be demolished and the location and size of existing structures and construction that are to remain on the site or plot. From the presented documents, it is undeterminable the effect of the additions on the existing conditions and accessibility to the new accessible entries, ramps, accessible routes and etc. Please submit a site plan showing all the above.
3. As per 2006 IBC: 1704.1.1 Statement of special inspections. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with Section 106.1 as a condition for permit issuance. This statement shall be in accordance with Section 1705.
4. As per the 2006 IBC: Section 106.3.4.2 Deferred submittals. For the purposes of this section, deferred submittals are defined as those portions of the design that are not submitted at the time of the application and that are to be submitted to the building official within a specified period. Deferral of any submittal items shall have the prior approval of the building official. The registered design professional in responsible charge shall list the deferred submittals on the construction documents for review by the building official.
5. Room 112 is still labeled "OFFICE".
6. Ceramic tile is not acceptable as a suitable material to be located behind and around the exhaust hood. The grout joints are susceptible to absorbing grease and dirt and are difficult to clean. Please provide an acceptable material as required by IMC 507.9.
7. At new toilet room Number 205:
a. No letter from kitchen director is included in resubmittal package.
b. All newly constructed toilet rooms shall be accessible. Please reference 2006 IBC, "3409.6 Alterations. A building, facility or element that is altered shall comply with the applicable provisions in Chapter 11 and ICC A117.1, unless technically infeasible. Where compliance with this sectionis technically infeasible, the alteration shall provide access to the maximum extent technically feasible."
" Section 1109.2 Toilet and bathing facilities. Toilet rooms and bathing facilities shall be accessible. Where a floor level is not required to be connected by an accessible route, the only toilet rooms or bathing facilities provided within the facility shall not be located on the inaccessible floor. At least one of each type of fixture, element, control or dispenser in each accessible toilet room and bathing facility shall be accessible.
8. Sheet 15 as per the original submittal was toilet elevation and plan details plus cabinet details. In this new submittal, sheet number 15 is now a duplicate of sheet 16 with revisions shown. The previous sheet 15 is now sheet 20.
a. Why is this?
b. All detail references from the architectural floor plan are incorrect.
Sheet 20
9. As per ICC/ANSI 117.1, Section 604.3, the lavatory may not encroach upon the clear space required for the toilet. Toilet Room 108 is non compliant. Please redesign.
10. Where are the dimensions for all required clearances for lavs and toilets?
11. The dimensions shown fro the Typical Accessory Mounting Heights are not as per ICC/ANSI 117.1, Section 603 and 604 and references.
12. In addition, toilet 205 is further non-compliant as per 2006 IBC, 1210.5 Toilet rooms: Toilet rooms shall not open directly into a room used for the preparation of food for service to the public.
END OF REVIEW
08/12/2009 RONALD BROWN ZONING HC SITE REVIEW Denied REFERENCE BUILDING COMMENTS
08/20/2009 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Comment not resolved; detail 105/M-3 references the "structural drawings" for information on how to connect the hoods to the building structure but no structural drawings cover the issue. Show how the hoods are being connected to the building structure. Reference: Section 302.1, IMC 2006.
2. The kitchen equipment list (A-4) shows a 2-burner range, a convection oven, and a combi-oven under hood H-1. Hood H-1 must be a Type I hood. Reference: Section 507.2, IMC 2006.
3. Verify that the walls adjacent to hood H-1 comply with the requirements of Section 507.9, IMC 2006.
4. Comment not resolved. Revise the energy code calculations to correspond to the proposed building additions. The plans do not show a metal building with a standing seam roof and the insulation is variously shown as batt insulation in the roof cavities (A-7), built-up roofing over a metal deck, (A-7), and as continuous insulation above a plywood roof deck (2/A-12). Reference: Section 104.2, International Energy Conservation Code 2006.
5. Provide documentation for the exterior wall construction noted as "other" in the energy code calculations. Reference: Section 104.2, International Energy Conservation Code 2006.
08/21/2009 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Clarify the "15 PSI" entry for the pressure regulator in the water pressure calculations. Reference: Sections 103.2.3 and 610.1, UPC 2006.
2. Comment not addressed. Clarify the design for the roof drainage for the new kitchen roof. Detail 1/A-8 shows an un-sized roof drain (primary drain) along with a scupper (secondary drain) but the roof plan on sheet A-10 does not show any roof drains. Reference: Sections 103.2.3 and 1101.11, UPC 2006.
3. Comment not addressed. The minimum opening width for a scupper is 6.25", based on a 2" roof drain requirement. Reference: Section 1101.11.2.1, UPC 2006.
4. Comment not addressed. Detail 1/A-8 indicates a "metl (sic) bug screen" enclosing the entry to the scupper. Show that the open area of the screen is at least 1.5 times greater than the minimum area of the scupper (4" x 6.25"). Reference: Sections 1101.11.2.1 and 1105.2, UPC 2006.
5. Comment not addressed. Show how the termination of the secondary (overflow) rainwater leader is clearly observable by the building occupants or maintenance personnel. Reference: Section 1101.11.2.2.1, UPC 2006.
6. Clarify the finished floor elevation for the administrative area; is the FFE (2484.86') for the basement or the ground floor?. Determine the need for a backwater valve per Section 710.1, UPC 2006, as amended by the City of Tucson.
7. Provide the percentage of open area for the louvers used for the combustion air openings for water heaters WH-1 and WH-3. Reference: Section 507, UPC 2006.
8. Provide a complete design for the flues for WH-1 and WH-3 and show that the termination of the flues (or flue if they are to be combined) complies with the requirements of Section 510.6.2, UPC 2006. If the sizing tables noted in Section 511.0 are not being used, submit an appeal to the building official along with technical documentation to justify how the flues have been sized. Reference: Sections 103.2.3, 301.2, and 511.0, UPC 2006.
08/28/2009 RICHARD JIROUDEK ELECTRICAL-COMMERCIAL REVIEW Denied Project: T09CM01281
5151 E. Pima St

Response letter dated 7/8/2009 is insufficent. Need to provide drawing showing how interlocking of exhaust fans with AC unit is to be done. Provide on mechanical or electrical plans.

Rich Jiroudek
Electrical plan chk
8/28/2009

Final Status

Task End Date Reviewer's Name Type of Review Description
09/02/2009 CINDY AGUILAR OUT TO CUSTOMER Completed
09/02/2009 SUE REEVES REJECT SHELF Completed