Permit Number: T09CM01232
Parcel: 12801005H

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T09CM01232
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/15/2009 MARTIN BROWN FIRE REVIEW Approved
05/19/2009 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET S-1; CALCULATIONS: CALCULATIONS INDICATE THE 8" TUBE DIMENSION IS IN THE VERTICAL DIRECTION. IS THIS THE CASE?
2. SHEET S-1; SECTION 3: INCLUDE THE NEW TUBE IN THIS SECTION, INDICATING HOW THE TUBES ARE CONNECTED TO THE EXISTING ROOF STRUCTURE.
3. SHEET S-1; PLAN VIEW 2: WHAT ARE THE HORIZONTAL BRACING MEMBER SIZES, AND HOW ARE THEY CONNECTED TO THE TUBE STEEL?
4. SHEET S-2; CALCULATIONS: CALCULATIONS INDICATE THE 6" TUBE DIMENSION IS IN THE VERTICAL DIRECTION. IS THIS THE CASE?
5. SHEET S-2; PLAN 1: INDICATE ON THE PLAN HOW THE TUBES ARE CONNECTED TO THE EXISTING ROOF STRUCTURE.
6. SHEET A-2; DETAIL 15: APPLY IBC SECTION 1109.8 AND ANSI SECTION 308 FOR ACCESSIBILITY TO STORAGE ELEMENTS. ADJUST DETAIL AS REQUIRED.
7. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL PLAN REVIEW COMMENTS.
05/20/2009 JOHN WILLIAMS COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
05/20/2009 ERIC NEWCOMB ZONING HC SITE REVIEW Denied 1. SEE BUILDING COMMENTS.
05/22/2009 GERRY KOZIOL WWM REVIEW Denied need 5th floor credit evaluation
06/02/2009 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Clarify the heat pumps being used for this suite; the calculations refer to HP-2 which doesn't appear to be on the plans.
2. Note that the use of ASHRAE Standard 62.1-2004 for ventilation calculations for multiple-zone systems supplied by a single air handler requires the use of the calculations covered by Section 6.2.5, ASHRAE Standard 62.1-2004 to determine the design outdoor air intake. Your balancing data for HP-1 (300 CFM), has added sufficient outside air to cover the greater air flow that would have been shown by the complete calculations.
06/03/2009 RMYERS1 WATER REVIEW Approved
06/03/2009 RICK MYERS PLUMBING-COMMERCIAL REVIEW Denied 1. Keynote number above keynote 12 on sheet P-1 detail C is missing. 2. Reference 608.7 2006 UPC, Where a water heater storage tank is located above the fixture outlets, a vacuum relief valve shall be installed. 3. Per Plumbing Plan Notes on sheet P-4, 2.14- Pipe Insulation, subsection "b", please identify size and type of insulation to be used. 4. Per detail 207, on sheet P-3, the temperature and pressure relief drain and the pan drain may not be combined. 5. On sheet P-2, Plumbing Schedule- modify mop sink hot water requirements to include 3/4" hot water supply. Remove 3/4" hot water requirement for water closet.
06/04/2009 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
06/09/2009 DELMA ROBEY OUT TO CUSTOMER Completed
06/09/2009 SUE REEVES REJECT SHELF Completed