Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T09CM01102
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/24/2009 | DAVE MANN | FIRE | REVIEW | Denied | The design professional must determine the following. A Fire Protection Engineer can be used if necessary. Please include the following fire sprinkler design criteria to the plans. 1. Flow data (static pressure, residual pressure, GPM) Available from the Fire Department (520) 791-3234 2. The standard to be used in development of sprinkler system. (NFPA 13, NFPA 13R, or NFPA 13D) 3. The hazard classification of the building, including any special hazards. 4. The density required of the water supply. |
| 07/24/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 07/27/2009 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: 114 E. Rillito Street T09CM01102 Building Plan (2nd Review) TRANSMITTAL DATE: July 27, 2009 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development plan with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped development plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t09cm01102.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: |
| 07/29/2009 | GERRY KOZIOL | WWM | REVIEW | Denied | NO STRUCTURES OR LANDSCAPING OF ANY KIND ALLOWED IN EXSISTING PUBLIC SEWER EASEMENT OR OVER EXSISTING PUBLIC SEWER I-14-039. D. WILLHOIT RWRD 740-6779 NEED FLOOR PLAN OF METAL BUILDING SHOWING PLUMBING FIXTURES FOR SEWER CONNECTION PER CALCULATION. SEE ATTACHED LETTER |
| 08/12/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Passed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/20/2009 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 08/20/2009 | SUE REEVES | REJECT SHELF | Completed |