| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/07/2009 | SREEVES1 | ADA | REVIEW | Passed | |
| 05/11/2009 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: 114 E. Rillito Street T09CM01102 Building Plan (1st Review) TRANSMITTAL DATE: May 11, 2009 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development plan with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped development plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t09cm01102.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: |
| 05/11/2009 | DAVE MANN | FIRE | REVIEW | Denied | Please include the following fire sprinkler design criteria to the plans. 1. Flow data (static pressure, residual pressure, GPM) Available from the Fire Department (520) 791-3234 2. The standard to be used in development of sprinkler system. (NFPA 13, NFPA 13R, or NFPA 13D) 3. The hazard classification of the building, including any special hazards. 4. The density required of the water supply. |
| 05/11/2009 | RONALD BROWN | ZONING HC SITE | REVIEW | Approved | |
| 05/11/2009 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 05/12/2009 | GERRY KOZIOL | WWM | REVIEW | Denied | |
| 05/12/2009 | JASON GREEN | ENGINEERING | REVIEW | Denied | DATE: May 12, 2009 SUBJECT: 114 E Rillito Street Building Plan- Engineering Review TO: J.A.C.A Design, LLC LOCATION: T14S R13E Sec01 Ward 3 REVIEWERS: Jason Green, CFM ACTIVITY: T09CM01102 (Building Plan) SUMMARY: Engineering Division of Development Services Department has received the building plan (T09CM01102) for the above referenced property. Engineering Division does not recommend approval of the building plan application at this time. The following items need to be addressed: BUILDING PLAN COMMENTS: 1) Engineering could not verify that the building plan was in compliance with the stamped approved site plan (T09CM01102). Please submit two copies of the stamped approved site plan, landscape, and NPPO plans with the next building plan submittal. 2) Engineering will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. GENERAL COMMENTS: Please provide the building plan with a copy of the last approved site plan. Further comments may be generated upon resubmittal of the building plan review. For questions or to schedule an appointment I can be reached at 837-4929. Jason Green, CFM Senior Engineer Associate Engineering Division COT Development Services |
| 05/12/2009 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
| 05/12/2009 | JASON GREEN | ENGINEERING | REVIEW | Denied | DATE: August 11, 2009 SUBJECT: 114 E Rillito Street Building Plan- 2nd Engineering Review TO: J.A.C.A Design, LLC LOCATION: T14S R13E Sec01 Ward 3 REVIEWERS: Jason Green, CFM ACTIVITY: T09CM01102 (Building Plan) SUMMARY: Engineering Division of Development Services Department has received the building plan (T09CM01102) for the above referenced property. Engineering Division does not recommend approval of the building plan application at this time. The following items need to be addressed: BUILDING PLAN COMMENTS: 1) Engineering could not verify that the building plan was in compliance with the stamped approved site plan (T09CM01102). Please submit two copies of the stamped approved site plan, landscape, and NPPO plans with the next building plan submittal. 2) Engineering will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. GENERAL COMMENTS: Please provide the building plan with a copy of the last approved site plan. Further comments may be generated upon resubmittal of the building plan review. For questions or to schedule an appointment I can be reached at 837-4929. Jason Green, CFM Senior Engineer Associate Engineering Division COT Development Services |
| 05/21/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 05/22/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Clarify the proposed scope of work. Reference: Section 103.2.3, UPC 2006. |
| 05/22/2009 | ROBERT SHERRY | WATER | REVIEW | Passed | |
| 06/01/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Passed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 06/05/2009 | CPIERCE1 | OUT TO CUSTOMER | Completed |