Permit Number: T09CM00963
Parcel: 13342001G

Address:
1925 N KOLB RD

Review Status: Completed

Review Details: COMMERCIAL NEW

Permit Number - T09CM00963
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/24/2009 DAVE MANN FIRE REVIEW Approved
04/24/2009 JOHN WILLIAMS COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
04/28/2009 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. GENERAL: ENGINEER OF RECORD STAMPING SHEETS C1.0 THROUGH C5.0 HAS A LICENSE THAT EXPIRED ON 9-30-08. VERIFY.
2. SHEET C8.1; WATER HARVESTING TANKS: IF TANKS EXCEED THE CRITERIA LISTED IN THE 2006 IBC, SECTION 105.2(5), STAMPED AND SIGNED DESIGN CALCULATIONS AND DRAWINGS ARE REQUIRED.
3. CALCULATIONS SHEET 5; CALCULATIONS SHEET 15: DID NOT LOCATE BEAM B4 ON KEY PLAN OR ON DRAWING. CLARIFY.
4. SHEET S1.1; CALCULATIONS SHEET 3: THE CONCRETE BASIS FOR DESIGN IN THE CALCULATIONS IS 3000 PSI FOR SLABS AND FOUNDATIONS, WHILE THE GENERAL NOTES IN THE DRAWINGS INDICATE THE CONCRETE COMPRESSIVE STRENGTH OF 4000 PSI. CLARIFY.
5. SHEET S1.1; CALCULATIONS SHEET 3: THE BOLTS BASIS FOR DESIGN IN THE CALCULATIONS IS A307. ADD A HIGH STRENGTH BOLT SPECIFICATION TO THE CALCULATIONS TO MATCH THE GENERAL NOTE FOR BEAM AND COLUMN CONNECTIONS.
6. SHEET S1.1; CALCULATIONS SHEET 3: THE REINFORCEMENT BASIS FOR DESIGN IN THE CALCULATIONS IS 60 KSI FOR #6 AND LARGER, AND 40 KSI FOR #5 AND SMALLER, WHILE THE GENERAL NOTES IN THE DRAWINGS INDICATE GRADE 60 FOR ALL BARS. CLARIFY.
7. SHEET S3.1; ROOF FRAMING PLAN: LOCATE THE COLUMNS FOR THE MECHANICAL SCREEN IN THE EAST/WEST DIRECTION.
8. SHEET S5.1 (DETAIL LP1); SHEET E0.1 (DETAIL N12): THE ELECTRICAL SHEET SHOULD REFERENCE STRUCTURAL FOR THE LIGHT POLE FOOTING.
9. SHEET S4.1 (DETAIL K9); CALCULATIONS: DID NOT FIND A CALCULATION FOR THE TRASH ENCLOSURE WALL AND FOOTING. CLARIFY.
04/30/2009 ERIC NEWCOMB ZONING HC SITE REVIEW Approved
05/01/2009 GERRY KOZIOL WWM REVIEW Approved
05/05/2009 JASON GREEN ENGINEERING REVIEW Denied DATE: May 5, 2009
REVIEWERS: Jason Green, CFM
ACTIVITY: T09CM00963 (Building Plan)


SUMMARY: Engineering Division of Development Services Department has received the building plan (T09CM00963). Engineering Division does not recommend approval of the building plan application at this time. The following items need to be addressed:


BUILDING PLAN COMMENTS:

1) Engineering could not verify that the building plan was in compliance with the stamped approved Development Plan (D09-0009). Please submit two copies of the stamped approved Development Plan, landscape, and NPPO plans with the next building plan submittal.

2) Engineering will re-review the building plan on the next submittal to insure compliance with the approved and stamped Development Plan. Additional comments may be forthcoming.


GENERAL COMMENTS:

Please provide the building plan with a copy of the last approved Development Plan (D09-0009). Further comments may be generated upon resubmittal of the building plan review.

For questions or to schedule an appointment I can be reached at 837-4929.




Jason Green, CFM
Senior Engineer Associate
Engineering Division
COT Development Services
05/05/2009 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied Project: 1925 N Kolb, T09CM00963
Convenience Store

Electrical plans denied for following:

1. Sheet E2.3 shows an 800 amp main whuile Sheet E1.1 shows a 1000 amp main, also clearify number of conduitd and conductors to service, each has different stated.
2.Sheet E1.1 panel E shows dispensers 11 and 12 with loads .

Ray T Majuta
DSD City of Tucson
Electrical plan k
520-837-4988
5-08-09
05/13/2009 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Quick Trip #1493
T09CM00963, T09CM00965 & T09BU00600
Building Plan (1st Review)

TRANSMITTAL DATE: May 13, 2009

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development plan with the next building plan submittal.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped development plan. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

C:\planning\grading\t09cm00963.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED:
05/19/2009 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Provide energy code compliance calculations for the building envelope. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006
05/20/2009 RICK MYERS PLUMBING-COMMERCIAL REVIEW Denied 1. Show that the floor of the restroom slopes toward the floor drain. Reference: Section 411.2 UPC 2006. 2.Coordinate the roof drainage design (sheet P2.3) and the building storm sewer design (civil sheet C5.0) Show storm drain piping, termination, and connection to building storm sewer. Reference: Sections 103.23 and 1101.12.2, UPC 2006.
05/20/2009 RMYERS1 WATER REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
09/25/2009 DELMA ROBEY OUT TO CUSTOMER Completed
09/25/2009 SUE REEVES REJECT SHELF Completed