Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T09CM00840
Parcel: 12217365A

Review Status: Completed

Review Details: COMMERCIAL NEW

Permit Number - T09CM00840
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/17/2009 TERRY STEVENS ZONING REVIEW Approved
04/17/2009 JOHN WILLIAMS COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
04/20/2009 RONALD BROWN ZONING HC SITE REVIEW Denied 1. SEE BUILDING COMMENTS.
04/22/2009 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. GENERAL: ALL DEFERRED SUBMITTALS MUST BE APPROVED BY THE BUILDING OFFICIAL, JESSIE SANDERS.
2. SHEET A-1; FLOOR PLAN: THE ACCESSIBILITY OF THE WASHER/DRYER AT THE NORTH END OF THE COMPLEX DOES NOT MEET THE ICC/ANSI A117.1-2003 SECTION 1004.10 REQUIREMENT FOR PARALLEL APPROACH. VERIFY AND CHANGE AS REQUIRED.
3. SHEET A-1; WINDOW/GLAZING NOTE 4: ADD REFERENCE IN THIS NOTE TO THE IBC SECTION 1026.
4. SHEET A-1; NOTE #3: ADD REFERENCE IN THIS NOTE TO DETAIL 3 ON SHEET D-3 FOR WALL REINFORCEMENT.
5. STRUCTURAL CALCULATIONS: NEW CALCULATIONS FOR THIS PROJECT MUST INCLUDE VERTICAL AND LATERAL ANALYSIS. PREVIOUSLY APPROVED CALCULATIONS MAY NOT BE USED IN LIEU OF NEW CALCULATIONS. PLEASE PROVIDE FRAMING, FOUNDATION, AND SHEARWALL REFERENCE KEY PLANS FOR THE CALCULATIONS TO AID IN THE PLAN CHECK.
6. GENERAL: EACH NEW PROJECT MUST BE STAMPED, SIGNED, AND DATED BY THE LICENSED ENGINEER AND/OR ARCHITECT OF RECORD. NEW PROJECTS CAN NOT HAVE THE SIGNATURE OR DATE ON PREVIOUSLY APPROVED SHEETS OF A PROJECT ALTERED AND INSERTED INTO THE NEW SET.
7. PROVIDE WRITTEN RESPONSES TO ALL COMMENTS.
05/01/2009 RICK MYERS PLUMBING-COMMERCIAL REVIEW Denied see 710.1 2006upc when backwater valve is required. see 904.1 2006upc sewer to be vented. vents located upstream of the bwv shall not be used for meeting cross-sectional area venting requirements. clarify waterpiping material type under slab; p-1 shows type k, p2 shows type l.
05/04/2009 GERRY KOZIOL WWM REVIEW Denied NEED CREDIT EVALUATION
05/05/2009 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. If the building energy compliance is not in accordance with ASHRAE 90.1, the duct insulation shall be determined by Section 503.2.7, IECC 2006, as amended by the City of Tucson. Reference: Section 501.2, IECC 2006, as amended by the City of Tucson.
2. The minimum size for a condensate drain is ¾"; no overflow drain is required for a rooftop unit. Reference: Section 307.2, IMC 2006.
05/05/2009 RMYERS1 WATER REVIEW Passed
05/08/2009 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
05/13/2009 DELMA ROBEY OUT TO CUSTOMER Completed
05/13/2009 SUE REEVES REJECT SHELF Completed