Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - SITE ALL
Permit Number - T09CM00695
Review Name: RESUBMITTAL - SITE ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/05/2009 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
| 10/13/2009 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 10/14/2009 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Denied | DATE: October 14, 2009 SUBJECT: Site TO: Jeffrey A Stanley LOCATION: 3038 E Ft. Lowell, T13S, R14E, Section 32, Ward 3 REVIEWERS: Bianca Ramirez, CFM ACTIVITY: T09CM00695 (Third Review) RESUBMITTAL REQUIRED: Site Plan, Drainage Report SUMMARY: Engineering Division of Development Services Department has received and reviewed the proposed site plan and drainage report for the above referenced property. Engineering Division does not recommend approval of the site plan or drainage report at this time. Please address the following review comments prior to the next submittal. Please include a response letter to the comments along with the corrected copies of the site plan and drainage report. Site Plan: 1. Complied 2. Complied 3. Complied 4. Complied 5. Show the limits of the 100-year floodplain and water surface elevation per D.S. 2-02.2.1.15. Include the line used to identify the limits of the 100-Year floodplain in the legend. Note: All current FIRM panels are on NGVD1929. Please revise elevations to show NGVD 1929. It has been noted that entire site is impacted by FEMA Zone AE. Please revise not 3 to call out NGVD 1929 OR Provide elevations for both datum's. 6. Complied 7. Complied 8. Complied 9. Complied 10. Please show dimensioned right-of-way, including any applicable Major Streets and Routes (MS&R) Plan right-of-way per D.S. 2-02.2.1.19. Note: D.S. 2-02.2.1.A.19 It does not appear that the future right-of-way (ROW) is shown correctly. Per the MS&R map the intersection widening width is 130'. Plan is showing 120' - please verify this is correct. 11. Complied 12. Complied 13. Complied 14. Verify that all easements of record have been graphically shown on the plan together with recording docket and page per D.S. 2-02.2.1.20. Note: Standard Comment will remain until plans have been approved. 15. Complied 16. Please provide existing topographic contours at intervals not exceeding two (2) feet and/or spot elevations as pertinent and Bench Mark based on City of Tucson Datum, including City Field Book and page number per D.S. 2-02.2.1.23. Note: Verify that topo lines, Finished Floor Elevations and FEMA information are all on same datum. 17. Complied 18. Complied 19. Complied 20. Complied 21. Complied 22. Complied 23. Complied 24. D.S. 2-02.2.1.A.20 The sidewalk shown along the west side of the Wintrode Office building is part of the required continuous pedestrian circulation /accessible route a pedestrian access easement is required to allow access to and from the proposed office building. Note: The existing ingress/egress parking & pedestrian easement will need to be modified to include the entire PAAL located south of the Wintrode Office prior to approval. Please clarify. 25. Complied 26. Additional comments may be forthcoming. Drainage Report: 1. Complied 2. Complied 3. Complied 4. Complied 5. Additional comments may be forthcoming. If you have any questions, I can be reached at 837-4928 or Bianca.Ramirez@tucsonaz.gov Bianca C. Ramirez Engineering Associate City of Tucson/Development Services Department 201 N. Stone Avenue P.O. Box 27210 Tucson, Arizona 85726-7210 (520) 837-4928 office (520) 879-8010 fax |