Review Details: COMMERCIAL NEW
Permit Number - T09CM00671
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/31/2009 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | Impact Fee's Do Apply; Central District; 3,800 Square Foot Warehouse; $11,138.40 |
04/01/2009 | TERRY STEVENS | ZONING | REVIEW | Denied | 04/02/2009 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site plan. Additional comments may be forthcoming. |
04/01/2009 | MARTIN BROWN | FIRE | REVIEW | Denied | Too far from existing hydrant. Fire sprinklers or additional hydrant required. Also, please provide fire department approved lock box at rolling gate. |
04/03/2009 | GERRY KOZIOL | WWM | REVIEW | Passed | |
04/07/2009 | RONALD BROWN | ZONING HC SITE | REVIEW | Passed | |
04/08/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | 1. A MINIMUM OF 3/32" LETTERING IS REQUIRED ON ALL DRAWINGS UNLESS A WRITTEN APPEAL IS APPROVED BY THE BUILDING OFFICIAL, JESSIE SANDERS. THIS APPROVED APPEAL MUST ACCOMPANY DRAWINGS SUBMITTED FOR CHECKING. 2. SHEET 2; ROOF FRAMING PLAN: REVISE THE PLAN TO SHOW THE ENTIRE BUILDING LAYOUT. THE 40' WIDTH AS SHOWN DOES NOT WORK WITH THE BAY WIDTHS INDICATED. 3. SHEET 2; ROOF FRAMING PLAN: REVISE THE PLAN TO INDICATE A BOXED COLUMN AT THE CENTER OF THE SPANS. 4. SHEET 3 (DETAIL 7); CALCULATIONS (PAGES 13, 16, AND 19): THE CALCULATIONS INDICATE 2- 3/4" DIAMETER ANCHOR BOLTS REQUIRED AT ALL COLUMNS. DETAIL 7 INDICATES 2 OR 4- 1/2" A307 BOLTS. CLARIFY AND REVISE. 5. SHEET 3 (DETAIL 9); CALCULATIONS (PAGE 28): THE CALCULATIONS INDICATE 2-10X3.5X14 GA. BOX COLUMN WHILE DETAIL 9 (NOTE 5) INDICATES TWO 8"X3 1/2"X14 GA. 'C' COLUMN (BOXED). CLARIFY AND REVISE. 6. SHEET 3 (DETAIL 6): SIDE VIEW REFERENCES KEY NOTE 25. REVISE TO NOTE 21? VERIFY. 7. SHEET 3 (DETAIL 7): TOP VIEW REFERENCES KEY NOTE 25. REVISE TO NOTE 21? VERIFY. 8. SHEET 3 (DETAIL 12): WHERE IS THIS DETAIL REFERENCED? KEY NOTES 11, 14, 15, AND 21 SHOULD BE VERIFIED. 9. SHEET 3 (DETAIL 13): KEY NOTES 11 AND 21 SHOULD BE VERIFIED. |
04/20/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
04/20/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
04/20/2009 | ROBERT SHERRY | WATER | REVIEW | Passed | |
04/20/2009 | JASON GREEN | ENGINEERING | REVIEW | Denied | DATE: April 22, 2009 SUBJECT: 3657 N 1st Avenue Building Plan- Engineering Review TO: Steve Koch LOCATION: T14S R14E Sec18 Ward 5 REVIEWERS: Jason Green, CFM ACTIVITY: T09CM00671 (Building Plan) SUMMARY: Engineering Division of Development Services Department has received the building plan (T09CM00671). Engineering Division does not recommend approval of the building plan application at this time. The following items need to be addressed: BUILDING PLAN COMMENTS: 1) Engineering could not verify that the building plan was in compliance with the stamped approved Site Plan (T09CM00671). Please submit two copies of the stamped approved Site Plan, landscape, and NPPO plans with the next building plan submittal. 2) Engineering will re-review the building plan on the next submittal to insure compliance with the approved and stamped Site Plan. Additional comments may be forthcoming. GENERAL COMMENTS: Please provide the building plan with a copy of the last approved Site Plan (T09CM00671). Further comments may be generated upon resubmittal of the building plan review. For questions or to schedule an appointment I can be reached at 837-4929. Jason Green, CFM Senior Engineer Associate Engineering Division COT Development Services |
04/23/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Passed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/06/2009 | THAUSER1 | OUT TO CUSTOMER | Completed |
05/06/2009 | SUE REEVES | REJECT SHELF | Completed |