Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL-BLDG/FIRE/ZONING/ENG
Permit Number - T09CM00586
Review Name: COMMERCIAL-BLDG/FIRE/ZONING/ENG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/16/2009 | DAVE MANN | FIRE | REVIEW | Denied | Please include the following fire sprinkler design criteria to the plans. 1. Flow data (static pressure, residual pressure, GPM) Available from the Fire Department (520) 791-3234 2. The standard to be used in development of sprinkler system. (NFPA 13, NFPA 13R, or NFPA 13D) 3. The hazard classification of the building, including any special hazards. 4. The density required of the water supply. |
| 03/16/2009 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 03/18/2009 | JASON GREEN | ENGINEERING | REVIEW | Denied | DATE: March 18, 2009 REVIEWERS: Jason Green, CFM ACTIVITY: T09CM00586 (Building Plan) SUMMARY: Engineering Division of Development Services Department has received the building plan (T09CM00586) for the above referenced property. Engineering Division does not recommend approval of the building plan application at this time. The following items need to be addressed: BUILDING PLAN COMMENTS: Engineering cannot approve the building plan until approval of the proposed Development Plan D08-0047. Provide a copy of the approved Development Plan with the next building plan submittal. Engineering will re-review the building plan on the next submittal to insure compliance with the approved Development Plan. Additional comments may be forthcoming. GENERAL COMMENTS: Further comments may be generated upon re-submittal of the building plan review. For questions or to schedule an appointment I can be reached at 837-4929. Jason Green, CFM Senior Engineer Associate Engineering Division COT Development Services |
| 03/19/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SEE BUILDING COMMENTS ON PROJECT T09CM00583. |
| 03/20/2009 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: 1884 S. Craycroft Rd T09CM00583 & T09CM00586 Building Plan (1st Review) TRANSMITTAL DATE: March 20, 2009 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved development package. Please submit two copies of the approved and stamped development, package with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped development plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t09cm00583.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: |
| 03/24/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | The minimum opening height for a scupper is 4". Reference: Section 1101.11.2.1, UPC 2006. |
| 03/24/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/31/2009 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 03/31/2009 | SUE REEVES | REJECT SHELF | Completed |