Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T09CM00583
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/24/2009 | DAVE MANN | FIRE | REVIEW | Approved | |
| 08/28/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 08/28/2009 | ERIC NEWCOMB | ZONING HC | REVIEW | Approved | |
| 08/31/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Comment not addressed. Show that the floor of the restroom slopes toward the floor drain. Reference: Section 411.2, UPC 2006. 2. Comment not resolved. Coordinate the waste and vent riser diagram with the plumbing floor plan. For example, a parallel 3" building drain is shown between the restrooms next to the 4" building drain and an extra floor sink is shown by the roof access ladder on the riser diagram. Reference: Section 103.2.3, UPC 2006. 3. Comment not resolved. The plumbing fixture schedule on sheet P1.1 calls for a Josam hydromechanical grease interceptor with the flow control device mounted at the sink, the plan notes on sheet P2.1 (11) calls for an accessible, vented flow control device located at the entrance to the trap (hydromechanical grease interceptor), and the riser diagram on sheet P2.1 specifies a Rockford hydromechanical grease interceptor with an integral flow control device. Clarify which hydromechanical grease interceptor is being installed where the flow control device will be located. Reference: Section 1014.2.1, UPC 2006. 4. Comment not resolved. The plumbing drawing calls for an 8" building storm drain but the civil drawing calls for a 6" building storm sewer Coordinate the roof drainage design (sheet P2.3) and the building storm sewer design (civil sheet 7 of 24). Reference: Section 1106.2, UPC 2006. |
| 09/01/2009 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 09/01/2009 | JASON GREEN | ENGINEERING | REVIEW | Approved | Will stamp plan set when all of plumbing comments have been addressed. Customer can bring the plans to the customer service counter anytime form 8am to 4pm Mon-Frid for stamp approval. |
| 09/02/2009 | STEVE SHIELDS | ZONING | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/09/2009 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |