Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM00563
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/12/2009 | RONALD BROWN | ADA | REVIEW | Passed | NOT A COT OWNED/OPERATED PROPERTY |
| 03/12/2009 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 03/12/2009 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 03/18/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. THE SPECIAL INSPECTION CERTIFICATE NEEDS TO HAVE THE NAME OF EACH INSPECTOR LISTED FOR EACH CATEGORY OF INSPECTION. 2. ALL DEFERRED SUBMITTALS MUST BE APPROVED BY THE BUILDING OFFICIAL, JESSIE SANDERS. 3. SHEET S1.1; DETAIL 06: INDICATE THE NOTE REFERENCES ON THE DETAIL. 4. SHEET S1.1 (DETAIL 04); CALCULATIONS PAGE 10: DETAIL 04 INDICATES A SINGLE ANGLE 8X4X1/2 OVER THE NEW LOUVER OPENING, WHILE THE CALCULATION OF PAGE 10 INVESTIGATES A DOUBLE ANGLE 8X4X1/2. CLARIFY. |
| 03/18/2009 | ERIC NEWCOMB | ZONING HC SITE | REVIEW | Approved | |
| 03/30/2009 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 03/30/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Clarify how the emergency cross-connection of the domestic water system is to be accomplished, i.e. provide a clearer picture of how the connection is to be made, including the pipe sizes, the type of backflow prevention assembly involved and if the work will affect the fire pump system. Reference: Section 103.2.3, UPC 2006. |
| 03/30/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Clarify which of the two versions of specification section 15180 is being used for this project: "Duct, Pipe & Equipment Insulation" or "Pipe and Equipment Insulation". Reference: Section 104.2, IECC, 2006. 2. Provide the maximum conductivity (k-value) that will be allowed for insulation of the chilled water piping, chilled water pumps, and chilled water equipment. Reference: Section 503.2.8, IECC, 2006. 3. Show how the new fan coil is being connected to the building structure and provide calculations to show that the building structure is not being adversely affected. Reference: Section 302.1, IMC 2006. |
| 03/31/2009 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 04/03/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/09/2009 | CPIERCE1 | OUT TO CUSTOMER | Completed |
| 04/09/2009 | SUE REEVES | REJECT SHELF | Completed |