Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM00551
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/11/2009 | MARTIN BROWN | FIRE | REVIEW | Denied | Please show location of existing fire hydrant(s) with dimensions to property lines. They must be within 500' (as the hose lays) of all parts of the building. |
| 03/11/2009 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | Impact Fee's Do Apply; East District; 7,018 Square Foot Medical Office; $44,361.65 |
| 03/13/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SEE BUILDING COMMENTS FOR PROJECT T09CM00550. |
| 03/16/2009 | ERIC NEWCOMB | ZONING HC SITE | REVIEW | Approved | |
| 03/19/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 03/24/2009 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 03/26/2009 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 04/02/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide information to show that the shower control valves conform to the requirements of ASSE 1016. Reference: Section 418.0, UPC 2006. 2. The roof drain is specified to have a Zurn Z199 downspout nozzle. How is this compatible with the note on sheet M3.1 that has the roof drain leader running under the sidewalk and terminating at the curb face? Reference: Section 103.2.3, UPC 2006. 3. The specified water closets require a minimum pressure greater than the 20-PSI used in the water pipe sizing calculations. Revise calculations as necessary. Reference: Section 608.1, UPC 2006. 4. Provide pressure-absorbing devices for the water connections to appliances equipped with quick-acting or solenoid valves (e.g. the clothes washer). Reference: Section 609.10, UPC 2006. |
| 04/03/2009 | ROBERT SHERRY | WATER | REVIEW | Denied | Provide the civil plans called out on sheet A0.2 that show the work to be done on the water service piping. Note that sheet A0.2 appears to show a backflow preventer for the irrigation piping but not for the building water service. |
| 04/03/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the energy compliance statement on sheet M9.1 to correspond to the building shown on the drawings. Approximately half of the windows have a projection factor much less than 0.25, not greater than 0.50 as noted. The architectural drawings and specifications have conflicting descriptions of the fenestration types, none of which seems to be "all other". 2. Pumped condensate waste shall terminate over an indirect waste receptor with either an air break or an air gap. Reference: Sections 807.1 and 814.0, UPC 2006. 3. Clarify the proposed exhaust flow rate for restrooms 132 and 135. Reference: Section 106.3.1, IMC 2006. |
| 04/06/2009 | LOREN MAKUS | ENGINEERING | REVIEW | Approved |