Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM00539
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/12/2009 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 03/17/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 03/17/2009 | ERIC NEWCOMB | ZONING HC SITE | REVIEW | Approved | |
| 03/25/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | The applicable code for all commercial plumbing projects is the 2006 Uniform Plumbing Code with Local Amendments. Provide an approved appeal to the building official if the plans are to be reviewed to the 2006 IPC. |
| 03/25/2009 | ROBERT SHERRY | WATER | REVIEW | Denied | 1. Provide the size of the existing water meter and the total connected water demand that will result from the addition of this activity. Reference: Sections 610.1 and 610.2, UPC 2006. 2. Show the location of the reduced pressure backflow assembly on the drawings and indicate the size of the assembly. Reference: City of Tucson Ordinance 9976, Backflow Prevention and Cross-connection Control. |
| 03/26/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the ventilation calculation for HP-1 to include the System Ventilation Efficiency (Ev) correction. Reference: Sections 6.2.5.2 through 6.2.5.4, ASHRAE 62.1-2004. 2. Clarify the relationship of the roof framing drawing (S1) with the mechanical floor plan (M1) with respect to the locations of the mechanical equipment and hoods. The plans show what appear to be two different buildings. Reference: Section 103.2.3, UPC 2006. 3. Correct the labeling for EF-4 on sheet M1. Reference: Section 103.2.3, UPC 2006. |
| 03/30/2009 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 04/06/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |