Permit Review Detail
Review Status: Completed
Review Details: CELL TOWER/ANTENNAS
Permit Number - T09CM00427
Review Name: CELL TOWER/ANTENNAS
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/26/2009 | DAVE MANN | FIRE | REVIEW | Approved | |
02/27/2009 | Michael Wyneken | PLANNING-CITY HALL | REVIEW | Denied | 1) Condition 12 of the special exception ordinance (#10628) regulates the antenna size, based upon the specifications submitted as part of the application. The ordinance limits the length of the antenna to 4' - 8" (56"). The proposed antenna is 5' - 2'' (62"). The Planning Director has determined that this is a minor change of condition and the 62" antennas can be approved administratively. Letter of approval has been sent to applicant with a copy inserted into application package. 2) Conditions 8 - 11 pertain to the appearance of the palm tree. Compliance with these conditions must be demonstrated in the plans with notes or details. (Bark cladding is proposed and noted) 3) The results of the buffelgrass survey required in condition 15 must be included with package. Should buffelgrass exist on the site, a mitigation management plan is required. 4) Condition 16 requires a drainage report. No report was included with the package. |
03/03/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. PROVIDE STRUCTURAL CALCULATIONS FOR THE 8" BLOCK WALL DESIGN AND ITS FOOTING. |
03/09/2009 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: T09CM00427 Cell Tower (1st Review) TRANSMITTAL DATE: March 9, 2009 1. The Cell Tower plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. The plan must be approved and stamped by the Special Exception Section prior to approval by Zoning. 3. Zoning will re-review the Cell Tower plan on the next submittal to insure compliance with the approved Special Exception process. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\celltower\t09cm00427.doc |
03/11/2009 | BRIAN HEFFERNAN | COMMUNICATIONS | REVIEW | Approved | |
03/12/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/16/2009 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
03/16/2009 | SUE REEVES | REJECT SHELF | Completed |