Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T09CM00355
Parcel: 14026045A

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T09CM00355
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/17/2009 JOHN WILLIAMS COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
02/18/2009 GERRY KOZIOL WWM REVIEW Approved
02/18/2009 MARTIN BROWN FIRE REVIEW Approved
02/20/2009 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
02/24/2009 ROBERT SHERRY WATER REVIEW Approved
02/24/2009 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the waste and vent diagram to match the plumbing floor plan. Reference: Section 103.2.3, UPC 2006.
2. Footnote 2 in Table 7-5, UPC 2006 indicates that a sink requires a 2" vertical waste pipe therefore the wet- vented section between the break room sink and the water closet shall be 2-1/2", not 2" in size. Reference: Sections 703.1 and 908.2, UPC 2006.
3. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006.
4. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006.
5. Provide a vacuum relief for storage-type water heaters located above any fixture outlets. Reference: Section 608.7, UPC 2006.
6. Correct the suite number to match the architectural drawings. Reference: Section 103.2.3, UPC 2006.
02/24/2009 RONALD BROWN BUILDING-COMMERCIAL REVIEW Approved
02/24/2009 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Clarify the design of the condensate drains for AC-3 and AC-4; it is unclear if the condensate drains are independent to the termination or if they are combined. If they are combined, the minimum size of the drain is 1", not 3/4". Reference: Section 307.2.2, IMC 2006, as amended by the City of Tucson.
2. Provide information on the sequence of operation for the restroom exhaust fans to show that recirculation of the air from the restrooms will not occur (i.e. the exhaust fans shall operate whenever AC-4 is supplying air to the restrooms). Reference: Section 403.2.1, IMC 2006.
3. Correct the suite number to match the architectural drawings. Reference: Section 106.3.1, IMC 2006.
02/24/2009 RONALD BROWN ZONING HC SITE REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
02/27/2009 DELMA ROBEY OUT TO CUSTOMER Completed
02/27/2009 SUE REEVES REJECT SHELF Completed